Project Reference List

All 63 projects, each with its place, application, consultant, capacity and install year, ready to cite in the experience clause of a specification.

The List

Projects by Application

Largest first in each application, and each row opens its project. Ask ECO₂ for any figure left blank.

Wastewater Odor Control

ProjectPlaceConsultantCapacity (lbs/day)Installed
Tung Chung Lift Station
Hong Kong
Jardine Matheson
5,200 lbs/day
Installed 2010
Frontera Pump Station
El Paso, Texas
CH2M Hill
5,000 lbs/day
Lift Station 85
St. Petersburg, Florida
St. Petersburg Water Resources
3,300 lbs/day
Installed 2023
Inland Empire Paper Mill Force Main and Primary Clarifiers
Spokane, Washington
Inland Empire Paper
2,100 lbs/day
Installed 2016
Grand Rapids Paper Mill Force Main and Primary Clarifiers
Grand Rapids, Minnesota
No external consultant
1,950 lbs/day
Installed 2021
Barbour Lane Pump Station
Louisville, Kentucky
CH2M Hill, Webster Environmental
1,900 lbs/day
Installed 2021
Forks of the River Force Main
Knoxville, Tennessee
BWSC
1,650 lbs/day
Installed 2006
Parkway-A Force Main
St. Joseph, Missouri
Burns & McDonnell
1,580 lbs/day
Carter's Creek and Theta Pike Lift Stations
Columbia, Tennessee
WMS Eng.
1,450 lbs/day
Installed 2009
Park City and Bel Aire Pump Stations
Wichita area, Kansas
PEC
1,255 lbs/day
Installed 2017
Lift Station 28
St. Petersburg, Florida
St. Petersburg Water Resources
1,100 lbs/day
Installed 2024
Paper Mill Primary Clarifier
Madison, Maine
Woodard & Curran
1,100 lbs/day
Installed 2012
Leucadia Force Main
Carlsbad, California
Dexter Wilson, Stantec
1,030 lbs/day
Installed 2021
Bluebird Lift Station
Laguna Beach, California
No external consultant
1,000 lbs/day
Installed 2006
Ethanol Plant Wastewater Lift Station
Fort Dodge, Iowa
Hazen and Sawyer
1,000 lbs/day
Installed 2008
Gulf Pond Pump Station
Milford, Connecticut
AECOM
1,000 lbs/day
Installed 2012
Industrial Wastewater Lift Station
Dayton, Ohio
Hazen and Sawyer
1,000 lbs/day
Installed 2018
Multiple Pump Stations
Scottsdale, Arizona
Waterworks Eng., Valentine Engineering
1,000 lbs/day
Installed 2018
SSU Force Main
The Villages, Florida
Halff Associates
1,000 lbs/day
Installed 2023
White Rock Pump Station
Vancouver, British Columbia, Canada
Point Four
1,000 lbs/day
Installed 2011
South West Regional Pump Station
Murfreesboro, Tennessee
SSR
970 lbs/day
Installed 2015
Owen Good Pump Station
Raymore, Missouri
HDR
955 lbs/day
Installed 2015
Chisholm Creek Lift Station
Edmond, Oklahoma
Freese and Nichols
915 lbs/day
Installed 2017
Regional Lift Station
Jurupa, California
Webb & Associates
850 lbs/day
Installed 2020
King County's two pump stations
Seattle, Washington
HDR
840 lbs/day
Installed 2019
Lower Salada Lift Station
Moulton Niguel, California
Tetra Tech
800 lbs/day
Installed 2009
Northlands Pump Station
Broomfield, Colorado
Burns & McDonnell
780 lbs/day
Installed 2013
Spring Creek Lift Station
Edmond, Oklahoma
Freese and Nichols
775 lbs/day
Installed 2018
Veterans Memorial Force Main
Bowling Green, Kentucky
GWR
610 lbs/day
Installed 2021
Jackson Road Pump Station
Ann Arbor, Michigan
OHM Advisors
500 lbs/day
Installed 2017
SOCWA Lift Station
Laguna Beach, California
No external consultant
500 lbs/day
Installed 2009
Upper Salada Lift Station
Moulton Niguel, California
Tetra Tech
500 lbs/day
Installed 2008
Rock Creek Pump Station
Broomfield, Colorado
Burns & McDonnell
400 lbs/day
Gem Lakes and Woodside Pump Stations
Aiken, South Carolina
Wooten Company
360 lbs/day
Installed 2020
Elk Vale Lift Station
Rapid City, South Dakota
CETEC Engineering
300 lbs/day
Installed 2013
Maplewood Road Pump Station
Windsor, Ontario, Canada
Dillon Consultants
260 lbs/day
Installed 2018
Middle Tributary Lift Station
Colorado Springs, Colorado
Burns & McDonnell
215 lbs/day
Installed 2009
Lift Station D
Delhi Township, Michigan
C2AE Engineers
200 lbs/day
Installed 2012
Torrington Prison Lift Station
Torrington, Wyoming
Baker Eng.
100 lbs/day
Installed 2009
Twin Street Lift Station
Brownsburg, Indiana
No external consultant
100 lbs/day
Installed 2012
Pump Station 1
Scarborough, Maine
No external consultant
80 lbs/day
Installed 2018
TRA Central Plant Influent Pump Station
Dallas, Texas
Alan Plummer & Associates

Wastewater Treatment

ProjectPlaceConsultantCapacity (lbs/day)Installed
Oilfield Produced Water Treatment
Cody, Wyoming
Merit Energy
6,150 lbs/day
Installed 2019
Paper Mill Wastewater Treatment Plant
Valliant, Oklahoma
Weyerhaeuser Paper
2,200 lbs/day
Installed 2005
Port Wentworth Wastewater Plant
Port Wentworth, Georgia
Port City Design Group
650 lbs/day
Installed 2011
Fort Valley Wastewater Treatment Plant
Fort Valley, Georgia
Carter & Sloope
560 lbs/day
Installed 2017
Travis Field Wastewater Treatment Plant
Savannah, Georgia
Thomas & Hutton
534 lbs/day
Installed 2022
Industrial Wastewater Treatment
Bay City, Michigan
CH2M Hill
266 lbs/day
Installed 2016
Aquifer Restoration Site
Lathrop, California
Arcadis
250 lbs/day
Installed 2012
HRSD SWIFT Research Center
Suffolk, Virginia
Hazen and Sawyer
100 lbs/day
Installed 2023
MBR Package Plant
Several locations
Ovivo

Lake & River Water Quality

ProjectPlaceConsultantCapacity (lbs/day)Installed
Savannah Harbor Expansion
Savannah, Georgia
US Army Corps of Engineers
40,000 lbs/day
Camanche Reservoir
Oakland, California
Alex Horne
16,000 lbs/day
Lake Hodges
San Diego, California
Brown and Caldwell
10,000 lbs/day
Installed 2019
San Pablo Reservoir
San Pablo, California
Brown and Caldwell
10,000 lbs/day
Installed 2024
Logan Martin Dam
Pell City, Alabama
Alabama Power
6,000 lbs/day
Wolf Creek Reservoir
Barberton, Ohio
Burgess & Niple
4,200 lbs/day
Installed 2015
Gowanus Canal Remediation
Brooklyn, New York
Dvirka & Bartilucci Consulting Engineers
3,500 lbs/day
Installed 2010
Xi Si Tang and Zou Ma Tang Canals
Shanghai, China
BioHaven
2,205 lbs/day
Installed 2019
Marston Reservoir
Denver, Colorado
CDM
2,200 lbs/day
Machado Lake
Los Angeles, California
Alex Horne
1,000 lbs/day
Installed 2017
Chambers Reservoir
Arapahoe County, Colorado
Burns & McDonnell
500 lbs/day
Installed 2013
Newman Lake
Spokane, Washington
Alex Horne
Installed 1992

The Next Step

Specifying a System?

Send the flows and the oxygen demand, and ECO₂ sizes the system and returns a budgetary price. The design data checklists list what it needs.

A stainless steel Speece Cone with its side stream pump and controls at a fenced pump station among pine trees