The Frontera PS pumps 5.5MGD through a large diameter, 3.5-mile-long force main to the Northwest WWTP. High H2S levels at the plant’s headworks had caused frequent odor complaints. The ECO2 superoxygenation system replaces a calcium nitrate feed system and achieves better results at approximately 35% of the cost.

Barbour Lane Pump Station, Ohio River Force Main

Location: Louisville, Kentucky
Project Applications: Wastewater H₂S Prevention
02 Capacity: 1900 lbs / day


