Projects

Frontera Pump Station

Project Data

Location: El Paso, Texas
Applications: Wastewater H₂S Prevention
02 Supply: LOX Storage Tank
02 Capacity: 5000 lbs / day
Project Consultant: Ch2mhill
ECO2 Project - El Paso, Texas

Project Summary

The Frontera PS pumps 5.5MGD through a large diameter, 3.5-mile-long force main to the Northwest WWTP. High H2S levels at the plant’s headworks had caused frequent odor complaints. The ECO2 superoxygenation system replaces a calcium nitrate feed system and achieves better results at approximately 35% of the cost.