Carter's Creek and Theta Pike Lift Stations
Columbia, Tennessee's two long force mains are prone to high sulfide. ECO₂ systems were installed to keep each one aerobic and eliminate H₂S along the pipe and at the discharge.
At a Glance
About the Project
The City of Columbia has two long sewer force mains subject to high sulfide generation. Each force main requires treatment to prevent corrosion and odors along the pipe and at the discharge. The ECO₂ oxygenation systems were installed to maintain aerobic conditions in each force main and eliminate H₂S.
1,450lbs/day
The system can dissolve up to 1,450 lbs of oxygen a day into two long force mains prone to high sulfide.
Source: ECO₂ project record
Technical Library
Related Research on Wastewater Odor Control
Case studies and technical papers on how these systems work and how they have performed.
Compare Systems
Similar Projects
The same application: the same use first, then the nearest places.
The Next Step
Planning a Similar System?
Send your flows and the oxygen demand for a system like Carter's Creek and Theta Pike Lift Stations. ECO₂ sizes the cone and returns a budgetary price, and its engineers can share more data on Carter's Creek and Theta Pike Lift Stations for a submittal.

Carter's Creek and Theta Pike lift stations, Columbia, Tennessee. 1,450 lbs/day.



