Carter’s Creek & Theta Pike Lift Stations

Project Data

Location: Columbia, Tennessee
Applications: Wastewater H₂S Prevention
02 Supply: LOX Storage Tank
02 Capacity: 1450 lbs / day
Project Consultant: WMS Eng.
ECO2 Project - Columbia, Tennessee

Project Summary

The City of Columbia has two long sewer force mains subject to high sulfide generation. Each force main requires treatment to prevent corrosion and odors along the pipe and at the discharge. The ECO2 oxygenation systems were installed to maintain aerobic conditions in each force main and eliminate H2S.