The City of Columbia has two long sewer force mains subject to high sulfide generation. Each force main requires treatment to prevent corrosion and odors along the pipe and at the discharge. The ECO2 oxygenation systems were installed to maintain aerobic conditions in each force main and eliminate H2S.

Barbour Lane Pump Station, Ohio River Force Main

Location: Louisville, Kentucky
Project Applications: Wastewater H₂S Prevention
02 Capacity: 1900 lbs / day


