An industrial area in Dayton, OH contains several corn processing facilities which discharge high temp, high strength wastewater to the city. The partnership between the industries and the city required odor and corrosion control in the force main. An ECO2 system was installed to prevent H2S in the line and at the discharge to the plant with a low-cost, environmentally friendly solution.

Barbour Lane Pump Station, Ohio River Force Main

Location: Louisville, Kentucky
Project Applications: Wastewater H₂S Prevention
02 Capacity: 1900 lbs / day


