When the Anson Madison WWTP was receiving high-strength wastewater from the local paper mill, they had been spending over $100,000/ year in calcium nitrate for odor control at their primary clarifier. The ECO2 System replaced the chemical feed system by maintaining aerobic conditions in the clarifier, to preventing H2S. After a few years, the paper mill closed; however, the system was modified and continues to add D.O. for conventional biological treatment.

Barbour Lane Pump Station, Ohio River Force Main

Location: Louisville, Kentucky
Project Applications: Wastewater H₂S Prevention
02 Capacity: 1900 lbs / day


