Projects

Forks Of The River Force Main

Project Data

Location: Knoxville, Tennessee
Applications: Wastewater H₂S Prevention
02 Supply: LOX Storage Tank
02 Capacity: 1650 lbs / day
Project Consultant: BWSC Eng.
ECO2 Project - Knoxville, Tennessee

Project Summary

The Knoxville Utilities Board installed two superoxygenation systems to prevent H2S formation in a 6.4 mile-long sewer force main, with a total retention time of 24 hours. One system is located at the beginning of the force main, and the second is located at the midpoint. Together, these systems add enough dissolved oxygen to protect the entire collection line from H2S odors and corrosion.