The Knoxville Utilities Board installed two superoxygenation systems to prevent H2S formation in a 6.4 mile-long sewer force main, with a total retention time of 24 hours. One system is located at the beginning of the force main, and the second is located at the midpoint. Together, these systems add enough dissolved oxygen to protect the entire collection line from H2S odors and corrosion.

Barbour Lane Pump Station, Ohio River Force Main

Location: Louisville, Kentucky
Project Applications: Wastewater H₂S Prevention
02 Capacity: 1900 lbs / day