Forks of the River Force Main
The Knoxville Utilities Board installed two Superoxygenation systems to prevent H₂S formation in a 6.4 mile-long sewer force main, with a total retention time of 24 hours.
At a Glance
About the Project
One system is located at the beginning of the force main, and the second is located at the midpoint. Together, these systems add enough dissolved oxygen to protect the entire collection line from H₂S odors and corrosion.
Under 1ppm
With oxygen, average H₂S in the force main fell to under 1 ppm, from 158 ppm untreated.
Source: Knoxville, TN Solves Odor and Corrosion Problems in Long Sewer Force Main, page 2
Diagram
How This System Works
ECO₂'s diagram of a system on a sewer force main like this one: a pump draws a side stream from the main, the Speece Cone® dissolves pure oxygen into it, and the water returns to the main with no bubbles.
Technical Library
Read the Papers
Case studies, articles and videos on Forks of the River Force Main, its owner's system or its city, then more of ECO₂'s research on wastewater odor control.
Compare Systems
Similar Projects
The same application: the same use first, then the nearest places.
The Next Step
Planning a Similar System?
Send your flows and the oxygen demand for a system like Forks of the River Force Main. ECO₂ sizes the cone and returns a budgetary price, and its engineers can share more data on Forks of the River Force Main for a submittal.




