This small diameter ECO2 system adds dissolved oxygen to the force main to prevent septic conditions and the formation of H2S. The oxygenation system effectively prevents odors and corrosion along the pipe and at the force main discharge, with a low operational cost.

Barbour Lane Pump Station, Ohio River Force Main

Location: Louisville, Kentucky
Project Applications: Wastewater H₂S Prevention
02 Capacity: 1900 lbs / day


