Veterans Memorial Force Main

A majority of Bowling Green's wastewater flow is piped to the treatment plant through a long force main, which inherently becomes anaerobic and generates sulfides.

At a Glance

About the Project

Place
Bowling Green
State or country
Kentucky
Oxygen capacity
610 lbs/day (277 kg/day)
Installed
2021
Oxygen supply
LOX Storage Tank
Consultant
GWR

To prevent high H₂S at the plant headworks, an oxygenation system was installed 1,000 ft upstream of the force main discharge. This system drastically reduces the sulfide levels in the combined plant influent, allowing for a smaller vapor phase treatment system to remove any residual H₂S from the headworks building.

  • 610lbs/day

    The system can dissolve up to 610 lbs of oxygen a day near the end of a long force main, cutting sulfide at the plant headworks.

    Source: ECO₂ project record

The Next Step

Planning a Similar System?

Send your flows and the oxygen demand for a system like Veterans Memorial Force Main. ECO₂ sizes the cone and returns a budgetary price, and its engineers can share more data on Veterans Memorial Force Main for a submittal.

A stainless steel Speece Cone with its side stream pump and controls at a fenced pump station among pine trees