A majority of Bowling Green’s wastewater flow is piped to the treatment plant through a long force main, which inherently becomes anaerobic and generates sulphides. To prevent high H2S at the plant headworks, an oxygenation system was installed 1,000 ft upstream of the force main discharge. This system drastically reduces the sulfide levels in the combined plant influent, allowing for a smaller vapor phase treatment system to remove any residual H2S from the headworks building.

Barbour Lane Pump Station, Ohio River Force Main

Location: Louisville, Kentucky
Project Applications: Wastewater H₂S Prevention
02 Capacity: 1900 lbs / day