Veterans Memorial Force Main
A majority of Bowling Green's wastewater flow is piped to the treatment plant through a long force main, which inherently becomes anaerobic and generates sulfides.
At a Glance
About the Project
To prevent high H₂S at the plant headworks, an oxygenation system was installed 1,000 ft upstream of the force main discharge. This system drastically reduces the sulfide levels in the combined plant influent, allowing for a smaller vapor phase treatment system to remove any residual H₂S from the headworks building.
610lbs/day
The system can dissolve up to 610 lbs of oxygen a day near the end of a long force main, cutting sulfide at the plant headworks.
Source: ECO₂ project record
Technical Library
Related Research on Wastewater Odor Control
Case studies and technical papers on how these systems work and how they have performed.
Compare Systems
Similar Projects
The same application: the same use first, then the nearest places.
The Next Step
Planning a Similar System?
Send your flows and the oxygen demand for a system like Veterans Memorial Force Main. ECO₂ sizes the cone and returns a budgetary price, and its engineers can share more data on Veterans Memorial Force Main for a submittal.