Projects

Veterans Memorial Force Main

Project Data

Location: Bowling Green, Kentucky
Applications: Wastewater H₂S Prevention
02 Supply: LOX Storage Tank
02 Capacity: 610 lbs / day
Project Consultant: GWR
ECO2 Project - Bowling Green, Kentucky

Project Summary

A majority of Bowling Green’s wastewater flow is piped to the treatment plant through a long force main, which inherently becomes anaerobic and generates sulphides. To prevent high H2S at the plant headworks, an oxygenation system was installed 1,000 ft upstream of the force main discharge. This system drastically reduces the sulfide levels in the combined plant influent, allowing for a smaller vapor phase treatment system to remove any residual H2S from the headworks building.

Related Projects