Moulton Niguel Water District in Southern California chose to install an oxygenation system by ECO2 to prevent anaerobic conditions and the formation of H2S in the force main downstream of the Upper Salada Lift Station. The system effectively prevents odors and corrosion along the force main and at the discharge.

Barbour Lane Pump Station, Ohio River Force Main

Location: Louisville, Kentucky
Project Applications: Wastewater H₂S Prevention
02 Capacity: 1900 lbs / day


