Alabama Power chose to install a superoxygenation system below the Logan Martin Dam to solve the fish kill problem in the river downstream. The system treats 14 MGD, dissolving about 6,000 lbs of oxygen per day, raising the D.O. at the discharge to 51 mg/l.



