Jackson Road Pump Station

Scio Township's long force main holds sewage for hours and is subject to high H₂S, so an ECO₂ system was installed at the Jackson Road Pump Station to protect the whole pipe.

At a Glance

About the Project

Place
Ann Arbor
State or country
Michigan
Oxygen capacity
500 lbs/day (227 kg/day)
Installed
2017
Oxygen supply
LOX Storage Tank
Consultant
OHM Advisors

Scio Township has a 3-mile long force main with over 8 hours of retention time making it subject to high H₂S levels. To stop odors and corrosion, an ECO₂ system was installed at the Jackson Road Pump Station to protect the entire length of force main and the discharge from H₂S.

  • 500lbs/day

    The system can dissolve up to 500 lbs of oxygen a day into a long force main with long retention times.

    Source: ECO₂ project record

The Next Step

Planning a Similar System?

Send your flows and the oxygen demand for a system like Jackson Road Pump Station. ECO₂ sizes the cone and returns a budgetary price, and its engineers can share more data on Jackson Road Pump Station for a submittal.

A stainless steel Speece Cone with its side stream pump and controls at a fenced pump station among pine trees