Scio Township has a 3-mile long force main with over 8 hours of retention time making it subject to high H2S levels. To stop odors and corrosion, an ECO2 system was installed at the Jackson Road Pump Station to protect the entire length of force main and the discharge from H2S.

Barbour Lane Pump Station, Ohio River Force Main

Location: Louisville, Kentucky
Project Applications: Wastewater H₂S Prevention
02 Capacity: 1900 lbs / day


