Jackson Road Pump Station
Scio Township's long force main holds sewage for hours and is subject to high H₂S, so an ECO₂ system was installed at the Jackson Road Pump Station to protect the whole pipe.
At a Glance
About the Project
Scio Township has a 3-mile long force main with over 8 hours of retention time making it subject to high H₂S levels. To stop odors and corrosion, an ECO₂ system was installed at the Jackson Road Pump Station to protect the entire length of force main and the discharge from H₂S.
500lbs/day
The system can dissolve up to 500 lbs of oxygen a day into a long force main with long retention times.
Source: ECO₂ project record
Technical Library
Read the Papers
Case studies, articles and videos on Jackson Road Pump Station, its owner's system or its city, then more of ECO₂'s research on wastewater odor control.
Compare Systems
Similar Projects
The same application: the same use first, then the nearest places.
The Next Step
Planning a Similar System?
Send your flows and the oxygen demand for a system like Jackson Road Pump Station. ECO₂ sizes the cone and returns a budgetary price, and its engineers can share more data on Jackson Road Pump Station for a submittal.




