The City of Scottsdale’s wastewater collection system consists of five (5) force mains piped to their two main Water Reclamation Facilities. The city used iron-based chemicals for odor control but needed a lower cost alternative without the negative process impacts. Valentine Engineering was hired to evaluate and design the optimal solution, choosing oxygenation at each pump station to prevent odors and corrosion in the entire collection system. (1 of 6 shown here)

Barbour Lane Pump Station, Ohio River Force Main

Location: Louisville, Kentucky
Project Applications: Wastewater H₂S Prevention
02 Capacity: 1900 lbs / day