Fort Valley Wastewater Treatment Plant

To meet the BOD limits of a new discharge permit, Fort Valley, Georgia chose to add dissolved oxygen to its plant effluent with an ECO₂ system over tertiary treatment.

At a Glance

About the Project

System
Superoxygenation
Place
Fort Valley
State or country
Georgia
Oxygen capacity
560 lbs/day (254 kg/day)
Installed
2017
Oxygen supply
O₂ Gas Cylinders
Consultant
Carter & Sloope

In order to meet BOD limits for a new surface discharge permit, the City of Fort Valley had two options: install tertiary treatment to remove additional 10 mg/L of BOD, or to offset BOD by adding 10 mg/L D.O. to the plant effluent. The city chose to offset BOD with the ECO₂ system for a much lower cost, smaller footprint, and greater flexibility.

The Next Step

Planning a Similar System?

Send your flows and the oxygen demand for a system like Fort Valley Wastewater Treatment Plant. ECO₂ sizes the cone and returns a budgetary price, and its engineers can share more data on Fort Valley Wastewater Treatment Plant for a submittal.

A stainless steel Speece Cone with its side stream pump and controls at a fenced pump station among pine trees