Fort Valley Wastewater Treatment Plant

Project Data

Location: Fort Valley, Georgia
Applications: Effluent Bod Offset, Wastewater Treatment Optimization
02 Supply: O2 Gas Cylinders
02 Capacity: 560 lbs / day
Project Consultant: Carter & Sloope
ECO2 Project - Fort Valley, Georgia

Project Summary

In order to meet BOD limits for a new surface discharge permit, the City of Fort Valley had two options: install tertiary treatment to remove additional 10 mg/L of BOD, or to offset BOD by adding 10 mg/L D.O. to the plant effluent. The city chose to offset BOD with the ECO2 system for a much lower cost, smaller footprint, and greater flexibility.