Fort Valley Wastewater Treatment Plant
To meet the BOD limits of a new discharge permit, Fort Valley, Georgia chose to add dissolved oxygen to its plant effluent with an ECO₂ system over tertiary treatment.
At a Glance
About the Project
In order to meet BOD limits for a new surface discharge permit, the City of Fort Valley had two options: install tertiary treatment to remove additional 10 mg/L of BOD, or to offset BOD by adding 10 mg/L D.O. to the plant effluent. The city chose to offset BOD with the ECO₂ system for a much lower cost, smaller footprint, and greater flexibility.
Under 20%
The ECO₂ system cost under 20% of the tertiary treatment equipment the city would otherwise have needed.
Source: Fort Valley, GA Post-Treatment Oxygenation For Net-Zero Ultimate BOD Discharge, page 2
Technical Library
Read the Papers
Case studies, articles and videos on Fort Valley Wastewater Treatment Plant, its owner's system or its city, then more of ECO₂'s research on wastewater treatment.
Compare Systems
Similar Projects
The same application: the same use first, then the nearest places.
The Next Step
Planning a Similar System?
Send your flows and the oxygen demand for a system like Fort Valley Wastewater Treatment Plant. ECO₂ sizes the cone and returns a budgetary price, and its engineers can share more data on Fort Valley Wastewater Treatment Plant for a submittal.