Barbour Lane Pump Station
The Metropolitan Sewer District in Louisville has an extensive sewer collection system including a large gravity interceptor, which is fed by a long pressurized force main.
At a Glance
About the Project
The District treated H₂S for years, but traditional chemicals have a limited effectiveness against corrosion and have a high cost. To evaluate and design a cost-effective solution capable of eliminating H₂S corrosion, the District hired two leading consultant firms, resulting in the installation of an oxygenation system by ECO₂.
1,900lbs/day
The system can dissolve up to 1,900 lbs of oxygen a day into a long force main that feeds a large gravity interceptor.
Source: ECO₂ project record
Technical Library
Related Research on Wastewater Odor Control
Case studies and technical papers on how these systems work and how they have performed.
Compare Systems
Similar Projects
The same application: the same use first, then the nearest places.
The Next Step
Planning a Similar System?
Send your flows and the oxygen demand for a system like Barbour Lane Pump Station. ECO₂ sizes the cone and returns a budgetary price, and its engineers can share more data on Barbour Lane Pump Station for a submittal.