Since installing the ECO2 system, the city has observed improved results and significant savings over the use of chemical treatment. The system maintains a positive D.O. throughout the force main and carries over into the downstream gravity main. The reduced H2S formation in the force main results in reduced loading on their downstream vapor phase odor scrubber, thereby extending its media life and additional cost savings.

Barbour Lane Pump Station, Ohio River Force Main

Location: Louisville, Kentucky
Project Applications: Wastewater H₂S Prevention
02 Capacity: 1900 lbs / day


