Lift Station D
At Lift Station D in Delhi Township, Michigan, the ECO₂ system is designed to meet the oxygen demand of the whole force main, to keep it from going septic and forming H₂S.
At a Glance
About the Project
The ECO₂ system is designed to satisfy the oxygen demand of the entire force main to prevent septic conditions. The presence of dissolved oxygen in the collection line is the most effective way to prevent H₂S formation and its associated corrosion and foul odor.
200lbs/day
The system can dissolve up to 200 lbs of oxygen a day, sized for the oxygen demand of the whole force main.
Source: ECO₂ project record
Technical Library
Related Research on Wastewater Odor Control
Case studies and technical papers on how these systems work and how they have performed.
Compare Systems
Similar Projects
The same application: the same use first, then the nearest places.
The Next Step
Planning a Similar System?
Send your flows and the oxygen demand for a system like Lift Station D. ECO₂ sizes the cone and returns a budgetary price, and its engineers can share more data on Lift Station D for a submittal.




