The City of Murfreesboro had significant odor and corrosion at their WWTP to high H2S. In order to protect the new headworks facility, they installed an ECO2 superoxygenation system 1.25 miles upstream of the plant to oxidize sulfides and prevent odor and corrosion at the force main discharge into the headworks.

Barbour Lane Pump Station, Ohio River Force Main

Location: Louisville, Kentucky
Project Applications: Wastewater H₂S Prevention
02 Capacity: 1900 lbs / day


