Projects

South West Regional Pump Station

Project Data

Location: Murfreesboro, Tennessee
Applications: Wastewater H₂S Prevention
02 Supply: LOX Storage Tank
02 Capacity: 970 lbs / day
Project Consultant: SSR
ECO2 Project - Murfreesboro, Tennessee

Project Summary

The City of Murfreesboro had significant odor and corrosion at their WWTP to high H2S. In order to protect the new headworks facility, they installed an ECO2 superoxygenation system 1.25 miles upstream of the plant to oxidize sulfides and prevent odor and corrosion at the force main discharge into the headworks.

Related Projects