After the successful operation of the first oxygenation system, a second ECO2 system was installed at the next upstream lift station to prevent sulfide formation in the force main between the SOCWA and Bluebird Station lift stations.

Barbour Lane Pump Station, Ohio River Force Main

Location: Louisville, Kentucky
Project Applications: Wastewater H₂S Prevention
02 Capacity: 1900 lbs / day


