Rock Creek Pump Station
After its first ECO₂ system, Broomfield had a similar one designed for its other influent force main, with all of its equipment hidden inside the Rock Creek Pump Station.
At a Glance
About the Project
After the success of their first ECO₂ system treating one of the city's two influent force mains, project consultants designed a similar system to treat the remaining influent force main. The small footprint and flexibility of installation of the Speece Cone system were ideal for concealing all equipment inside the pump station, to maintain visual aesthetics of the site.
400lbs/day
The system, all inside the pump station, can dissolve up to 400 lbs of oxygen a day into the city's second influent force main.
Source: ECO₂ project record
Technical Library
Read the Papers
Case studies, articles and videos on Rock Creek Pump Station, its owner's system or its city, then more of ECO₂'s research on wastewater odor control.
Compare Systems
Similar Projects
The same application: the same use first, then the nearest places.
The Next Step
Planning a Similar System?
Send your flows and the oxygen demand for a system like Rock Creek Pump Station. ECO₂ sizes the cone and returns a budgetary price, and its engineers can share more data on Rock Creek Pump Station for a submittal.




