A short section of a dual force main was identified as an ideal location to dissolve enough oxygen to remove dissolved sulphides before discharging at the Eastgate Pump Station. An ECO2 system was part of a large project to upgrade the pump station, earning King County the 2021 Envision Silver Award for Sustainability.
Sunset Heathrow Pump Station
AWARD WINNING PROJECT
Project Data
Location: Seattle, Washington
Applications: Wastewater H₂S Prevention
02 Supply: Onsite O2 Generator
02 Capacity: 840 lbs / day
Project Consultant: HDR
Project Summary
Additional Information
Related Projects

Barbour Lane Pump Station, Ohio River Force Main

Location: Louisville, Kentucky
Project Applications: Wastewater H₂S Prevention
02 Capacity: 1900 lbs / day

Carter’s Creek & Theta Pike Lift Stations

Location: Columbia, Tennessee
Project Applications: Wastewater H₂S Prevention
02 Capacity: 1450 lbs / day

Elk Vale Lift Station

Location: Rapid City, South Dakota
Project Applications: Wastewater H₂S Prevention
02 Capacity: 300 lbs / day