King County's two pump stations

For King County, a short section of a dual force main was found to be the ideal place to dissolve enough oxygen to remove the dissolved sulfides from the sewage.

At a Glance

About the Project

Place
Seattle
State or country
Washington
Oxygen capacity
840 lbs/day (381 kg/day)
Installed
2019
Consultant
HDR
Award
Envision® Silver Award, Institute for Sustainable Infrastructure
  • 840lbs/day

    The system can dissolve up to 840 lbs of oxygen a day to remove dissolved sulfides in a short section of dual force main.

    Source: ECO₂ project record

The Next Step

Planning a Similar System?

Send your flows and the oxygen demand for a system like King County's two pump stations. ECO₂ sizes the cone and returns a budgetary price, and its engineers can share more data on King County's two pump stations for a submittal.