SSU Force Main
In The Villages, Florida, pure oxygen replaced costly chemicals on a long force main with high H₂S spikes, and with the ECO₂ system the H₂S levels have dropped to zero.
At a Glance
About the Project
The Villages was experiencing extremely high H₂S spikes at ARVs on a long sewer force main. Chemical feed proved to be too costly, so the local utility chose to use pure oxygen for preventing H₂S with a lower cost of operation. With the ECO₂ system, H₂S levels have dropped to zero.
1,000lbs/day
The system can dissolve up to 1,000 lbs of oxygen a day into a long sewer force main where H₂S spiked at the air release valves.
Source: ECO₂ Project Portfolio: 20 years of Superoxygenation Installations (April 2026), page 6
Technical Library
Read the Papers
Case studies, articles and videos on SSU Force Main, its owner's system or its city, then more of ECO₂'s research on wastewater odor control.
Compare Systems
Similar Projects
The same application: the same use first, then the nearest places.
The Next Step
Planning a Similar System?
Send your flows and the oxygen demand for a system like SSU Force Main. ECO₂ sizes the cone and returns a budgetary price, and its engineers can share more data on SSU Force Main for a submittal.