Chisholm Creek Lift Station
The sewer collection system in the City of Edmond, OK, includes two long force mains with high H₂S formation potential, which have caused significant odor and corrosion issues.
At a Glance
About the Project
The first ECO₂ system was installed at the Chisholm Creek Lift Station to treat the 18" diameter, 4-mile-long force main. The Speece Cone system dissolves enough oxygen to sustain aerobic conditions, reducing H₂S release along the force main.
915lbs/day
Edmond's first ECO₂ system can dissolve up to 915 lbs of oxygen a day into the 18 inch, 4 mile force main.
Source: ECO₂ Project Portfolio: 20 years of Superoxygenation Installations (April 2026), page 14
Technical Library
Read the Papers
Case studies, articles and videos on Chisholm Creek Lift Station, its owner's system or its city, then more of ECO₂'s research on wastewater odor control.
Compare Systems
Similar Projects
The same application: the same use first, then the nearest places.
The Next Step
Planning a Similar System?
Send your flows and the oxygen demand for a system like Chisholm Creek Lift Station. ECO₂ sizes the cone and returns a budgetary price, and its engineers can share more data on Chisholm Creek Lift Station for a submittal.




