Treated wastewater from the Weyerhauser Paper Mill is pumped over 5 miles to the outfall at a small creek. To meet discharge requirements for D.O. at the end of the pipe, an ECO2 system was installed, improving the overall water quality in the creek and the ecosystem downstream.



