Maplewood Road Pump Station

In Windsor, Ontario, an ECO₂ system keeps a force main of high strength industrial wastewater from going septic, with H₂S near zero at its discharge.

At a Glance

About the Project

Place
Windsor
State or country
Ontario, Canada
Oxygen capacity
260 lbs/day (118 kg/day)
Installed
2018
Oxygen supply
LOX Storage Tank
Consultant
Dillon Consultants

The City of Windsor installed an ECO₂ system to prevent septic conditions in a 4,000 ft long force main which transports high strength industrial wastewater to the regional treatment plant. The H₂S level at the force main discharge is consistently near zero, and plant upsets from high BOD surges have been prevented.

  • 260lbs/day

    The system can dissolve up to 260 lbs of oxygen a day into a force main carrying high-strength industrial wastewater.

    Source: ECO₂ project record

The Next Step

Planning a Similar System?

Send your flows and the oxygen demand for a system like Maplewood Road Pump Station. ECO₂ sizes the cone and returns a budgetary price, and its engineers can share more data on Maplewood Road Pump Station for a submittal.

A stainless steel Speece Cone with its side stream pump and controls at a fenced pump station among pine trees