Projects

Maplewood Road Pump Station

Project Data

Location: Windsor, Ontario
Applications: Wastewater H₂S Prevention
02 Supply: LOX Storage Tank
02 Capacity: 260 lbs / day
Project Consultant: Dillon Consultants
ECO2 Project - Windsor, Ontario

Project Summary

The City of Windsor installed an ECO2 system to prevent septic conditions in a 4,000 ft long force main which transports high strength industrial wastewater to the regional treatment plant. The H2S level at the force main discharge is consistently near zero, and plant upsets from high BOD surges have been prevented.

Related Projects