After the success of their first ECO2 project in 2008, a similar system was installed at the next downstream lift station. The oxygenation system prevents the formation of H2S in the force main downstream of the Lower Salada Lift Station, effectively preventing odors and corrosion at all points along the force main and at the discharge.

Barbour Lane Pump Station, Ohio River Force Main

Location: Louisville, Kentucky
Project Applications: Wastewater H₂S Prevention
02 Capacity: 1900 lbs / day


