Force Main Design Data Checklist

Flow, pipe length and diameter, detention and sulfide levels for sewer odor and corrosion control. Fill it in online, save as you go, and send it to ECO₂'s engineers.

Design Data

Answer What You Know, Then Send It to ECO₂

Your answers save in this browser as you go, so you can stop and come back. ECO₂'s engineers size the system from them and ask for anything missing.

  1. About This Checklist
  2. Required Information
  3. Additional Information
  4. Your Details
  5. Review & Send

Step 1 of 5: About This Checklist

0 of 20 answered

Units

About This Checklist

To prevent the formation of hydrogen sulfide (H₂S), a positive dissolved oxygen (D.O.) level must be carried through the force main. The amount of oxygen needed is determined by multiplying the longest hydraulic retention time (HRT) of the force main by a theoretical ~10 mg/L/hr oxygen uptake rate. The critical HRT is the longest period of time that wastewater is in the force main. For a continuous flow system, the critical HRT will occur during low flow conditions. For a fill/draw system, the critical HRT will occur during the longest period of time between pumping cycles. Once the critical HRT is determined and the oxygen requirement is calculated, the oxygen requirement is checked against the pressure inside the force main. For every one (1) foot of head pressure, one (1) mg/L of dissolved oxygen can be dissolved. If there is sufficient pressure in the force main to dissolve the amount of oxygen required, there is a technical fit for the ECO₂ system.

Prefer paper? Print the blank checklist, fill it in and send it to ECO₂.

Anticipated Project Implementation Date

Your checklist answers (not your name or contact details) are saved in this browser on this device for 30 days. Nothing goes to ECO₂ until you press Send. On a shared computer, press Clear My Answers when you finish.