Port Wentworth Wastewater Plant
To meet a new river discharge BOD limit, Port Wentworth, Georgia chose to offset BOD with dissolved oxygen in its effluent, using ECO₂'s technology for its low cost.
At a Glance
About the Project
In order to meet their new river discharge BOD limit, the City of Port Wentworth had two options: install tertiary treatment for further BOD removal, or to offset with D.O. at the plant effluent. The city chose ECO₂'s technology for its low cost, small footprint, and ease of use.
Under 20%
The ECO₂ system cost under 20% of the tertiary treatment equipment the city would otherwise have needed.
Source: Port Wentworth, GA WWTP Effluent Dissolved Oxygen for Net-Zero UOD, page 2
Technical Library
Read the Papers
Case studies, articles and videos on Port Wentworth Wastewater Plant, its owner's system or its city, then more of ECO₂'s research on wastewater treatment.
Compare Systems
Similar Projects
The same application: the same use first, then the nearest places.
The Next Step
Planning a Similar System?
Send your flows and the oxygen demand for a system like Port Wentworth Wastewater Plant. ECO₂ sizes the cone and returns a budgetary price, and its engineers can share more data on Port Wentworth Wastewater Plant for a submittal.




