With low flows and long retention times, this pump station was the ideal location for superoxygenation. The high pressure in the line allows for enough oxygen to be dissolved to carry through the 8-hour retention time to prevent H2S at the discharge of this 1-mile long force main.

Barbour Lane Pump Station, Ohio River Force Main

Location: Louisville, Kentucky
Project Applications: Wastewater H₂S Prevention
02 Capacity: 1900 lbs / day