The City of Chisholm Creek chose to install an ECO2 system at two pump stations in their collection system to prevent septic conditions and the formation sulfides. H2S odors and corrosion are prevented for the total length and the discharge of each force main.

Barbour Lane Pump Station, Ohio River Force Main

Location: Louisville, Kentucky
Project Applications: Wastewater H₂S Prevention
02 Capacity: 1900 lbs / day


