
Engineer Resources
Everything you need to size and specify a Speece Cone® system: the design data checklists, the reference list, ECO₂'s technical bulletins and the calculations.
01By Application
Wastewater Odor Control
Design Data Checklists
Guides to Sewer Odor, H₂S & Oxygen
02By Application
Wastewater Treatment
Design Data Checklists
Resources
- Case StudiesECO₂'s case studies for this application, in the Technical Library.
- Technical DocumentsEvery paper, bulletin, article and video for this application, in the Technical Library.
- System AnimationPick your water and the oxygen supply, and watch an ECO₂ system go in, stage by stage.
- Aeration vs OxygenationOxygen transfer, energy per ton and the dissolved oxygen each method reaches, with where pure oxygen pays and where air still does the job.
03By Application
Lake & River Water Quality
Design Data Checklists
04Size It
Design Data for Your Specification
The Reference List
Every project with its place and engineer
The Reference List
All 63 projects with the place, the application and the engineer, for the experience clause.
The Largest on the List
- Savannah Harbor ExpansionSavannah, GeorgiaLake & River Water Quality40,000 lbs/day
- Camanche ReservoirOakland, CaliforniaLake & River Water Quality16,000 lbs/day
- Lake HodgesSan Diego, CaliforniaLake & River Water Quality10,000 lbs/day
- San Pablo ReservoirSan Pablo, CaliforniaLake & River Water Quality10,000 lbs/day
- Oilfield Produced Water TreatmentCody, WyomingWastewater Treatment6,150 lbs/day
ECO₂'s Technical Bulletins
- Technical paper
Oxygen Demand & Solubility Calculations
Read the Technical Paper - Technical paper
Comparing Aeration with Oxygenation
Read the Technical Paper - Technical paper
Comparing Liquid & Onsite Oxygen Sources
Read the Technical Paper - Technical paper
Oxygen Uptake Rate Test Procedure
Read the Technical Paper
05Prove It
What Installed Systems Measured
Under 1ppm
Average H₂S at the end of Knoxville's 6.4-mile force main is under 1 ppm with oxygen, down from 158 ppm. 95%
In a 60-day test by the US Army Corps of Engineers, the cones averaged 95% or better oxygen transfer efficiency, against an 80% criterion. 13,385lbs/day
In the Corps of Engineers' 2019 test, one Savannah Harbor plant delivered 13,385 lbs of oxygen a day. 9.2mg/L
Kennebunk, Maine's effluent averaged 9.2 mg/L of dissolved oxygen through the hot summer months, when the permit limit was hardest to meet.
Projects for Your Experience Clause
Sewer, plant, lake and harbor projects to cite
Projects for Your Experience Clause
06The Next Step
Ready for a Number?
Tell us about your site and ECO₂'s engineers will size a system and send a budgetary price. Start with the checklist for your application, or see a system installed first in the System Animation.











