Elk Vale Lift Station

Rapid City, South Dakota's oversized force main holds sewage long and forms H₂S, so the city installed an ECO₂ system against odor and corrosion along it and at its discharge.

At a Glance

About the Project

Place
Rapid City
State or country
South Dakota
Oxygen capacity
300 lbs/day (136 kg/day)
Installed
2013
Oxygen supply
LOX Storage Tank
Consultant
CETEC Engineering

An oversized force main causes high retention times and high H₂S formation. The city installed an ECO₂ system to eliminate odors and corrosion in the force main and at its discharge point. The oxygenation system was designed to treat existing flows of 315 gpm in a 8" force main, as well as future anticipated flow of 1,000 gpm in a new 16" force main.

  • 300lbs/day

    The system can dissolve up to 300 lbs of oxygen a day into an oversized force main with long retention times.

    Source: ECO₂ project record

The Next Step

Planning a Similar System?

Send your flows and the oxygen demand for a system like Elk Vale Lift Station. ECO₂ sizes the cone and returns a budgetary price, and its engineers can share more data on Elk Vale Lift Station for a submittal.

A stainless steel Speece Cone with its side stream pump and controls at a fenced pump station among pine trees