An oversized force main causes high retention times and high H2S formation. The city installed an ECO2 system to eliminate odors and corrosion in the force main and at its discharge point. The oxygenation system was designed to treat existing flows of 315 gpm in a 8’’ force main, as well as future anticipated flow of 1,000 gpm in a new 16’’ force main.

Barbour Lane Pump Station, Ohio River Force Main

Location: Louisville, Kentucky
Project Applications: Wastewater H₂S Prevention
02 Capacity: 1900 lbs / day