Elk Vale Lift Station

Project Data

Location: Rapid City, South Dakota
Applications: Wastewater H₂S Prevention
02 Supply: LOX Storage Tank
02 Capacity: 300 lbs / day
Project Consultant: CETEC Engineering
ECO2 Project - Rapid City, South Dakota

Project Summary

An oversized force main causes high retention times and high H2S formation. The city installed an ECO2 system to eliminate odors and corrosion in the force main and at its discharge point. The oxygenation system was designed to treat existing flows of 315 gpm in a 8’’ force main, as well as future anticipated flow of 1,000 gpm in a new 16’’ force main.