A new ethanol plant required the construction of a dedicated lift station to transfer wastewater to the municipal treatment plant. As part of the project, an ECO2 system was installed to eliminate H2S odor and corrosion, and prevent plant upsets from high-strength influent flows.

Barbour Lane Pump Station, Ohio River Force Main

Location: Louisville, Kentucky
Project Applications: Wastewater H₂S Prevention
02 Capacity: 1900 lbs / day


