ECO2 Project Portfolio: 20 years of Superoxygenation InstallationsDoc Type: Brochures, Case StudiesApplication: Industrial Wastewater - High Sulfide Removal, Lakes & Rivers, Sewer H₂S Prevention, Odor & Corrosion, Supplemental D.O. (BOD, AOP, MBR), Treated Effluent D.O., Treatment Wetlands, Wastewater Treatment ProcessesREAD MOREDOWNLOAD PDF
ECO₂ Wastewater OxygenationDoc Type: BrochuresApplication: Sewer H₂S Prevention, Odor & Corrosion, Treated Effluent D.O., Wastewater Treatment ProcessesREAD MOREDOWNLOAD PDF
Reduction of Taste and Odor Compounds and Soluble Manganese in San Pablo Reservoir (Final Report – December 2017)
Hypolimnetic Oxygenation 3: An Engineered Switch from Eutrophic to a Meso-/Oligotrophic State in a California Reservoir