USACE Down River ECO₂ Speece Cone®

A drone flight over the Savannah Harbor Expansion Project's finished down-river oxygen site, with its Speece Cones® lined up under the pipe racks by the river.

Details

Publisher
U.S. Army Corps of Engineers
Published
June 2020
Author
GA Ports Authority
Video
YouTube, 0:37

Summary

Down-River Site, Seen from the Air

This short drone video flies over the down-river dissolved oxygen system of the U.S. Army Corps of Engineers' Savannah Harbor Expansion Project (video description). It shows the finished site on the riverbank: Speece Cones lined up under the pipe racks, the building and equipment pad behind them, and the structures at the water's edge.

Questions

What does the Savannah down-river fly-over show?

The down-river dissolved oxygen system of the Savannah Harbor Expansion Project from a drone: Speece Cones under the pipe racks on the riverbank, with the building and equipment behind them (video description).

Who filmed the Savannah down-river fly-over?

Jeremy Polston of the Georgia Ports Authority (video description).

Where is the Savannah down-river oxygen site?

On the bank of the Savannah River; the Corps' video of the cones arriving places the down-river cones on Hutchinson Island.

Is there a video of the up-river site?

Yes. The library has the matching fly-over of the up-river site, linked from this page.

The Project

Savannah Harbor Expansion

Location
Savannah, Georgia
Application
River Water Quality
Capacity
40,000 lbs/day
See the Project

In Full

The Full Write-Up

The problem, the work, the results and who did it.

Keeping Oxygen in a Deepened Harbor

The Savannah Harbor Expansion Project deepens the harbor's shipping channel. Its dissolved oxygen system adds oxygen to the Savannah River so the deeper harbor keeps its dissolved oxygen; this site is the down-river half of that system (video description).

What the Fly-Over Shows

The drone comes in over the riverbank. A long pipe rack runs along the shore with the Speece Cones beneath it, piping running down to structures at the edge of the river. Behind them stand a building and a fenced pad of white equipment, with a paved yard and lighting around the site.

The camera circles the site and pulls back over the river, showing the whole installation against the water and the wooded bank.

A Finished, Working Site

The clip shows the system built and in place, a counterpart to the time-lapse of its construction and the video of its cones arriving. It gives no figures; the Savannah case study and test report in the library carry them.

The Corps, with Footage from the Georgia Ports Authority

The U.S. Army Corps of Engineers runs the Savannah Harbor Expansion Project. Jeremy Polston of the Georgia Ports Authority shot the footage (video description).

Why the Overview Helps

A drawing rarely conveys the footprint of a river-scale oxygen system. From the air you see how the cones, pipe racks and support equipment fit on a strip of riverbank, which helps anyone planning a similar site.

Written up from the video. Every figure is as the video's speakers give it or its YouTube description prints it, with the moment it comes from; the speakers' own words appear only in quotation marks.

How to Cite

One line to paste into a report.

GA Ports Authority. USACE Down River ECO₂ Speece Cone®. U.S. Army Corps of Engineers, June 2020. Project engineer: Amec Foster Wheeler, CDM Smith, U.S. Army Corps of Engineers. Eco Oxygen Technologies Technical Library. https://eco2tech.com/technical-library/usace-down-river-eco2-speece-cone/

https://eco2tech.com/technical-library/usace-down-river-eco2-speece-cone/

The Next Step

Ask an ECO₂ Engineer

Questions about this video, or about your own water? An application engineer answers, with the figures.

A row of stainless steel Speece Cones with ECO₂ signs on the Savannah River, Georgia