King County's two pump stations earn Envision® Silver Award
King County's $40 million upgrade of two pump stations and their force main won an Envision Silver Award from the Institute for Sustainable Infrastructure.
Details
Summary
An Envision Silver for King County
Stantec designed it. Alongside new pumps, a new 24-inch force main and habitat restoration, the project added a novel oxygen injection system to control odor and corrosion (pp. 1, 2).
Key Figures
40million dollars
Cost of the upgrade of the two pump stations and their force main Source: PDF page 1 (opens in a new tab)
30million gallons a day
Peak capacity the upgraded system can convey Source: PDF page 1 (opens in a new tab)
24inch
New force main, replacing an old 12-inch pipe Source: PDF page 2 (opens in a new tab)
Questions
What is the Envision Silver Award?
An award from the Institute for Sustainable Infrastructure for projects that encourage sustainable, equitable and resilient design, construction, operations and maintenance. King County's pump station and force main upgrade won one, announced on March 16, 2022 (p. 1).
Why did King County upgrade these pump stations?
After nearly 50 years of reliable service they were reaching their operational limits. The upgrade lets the system convey a peak of 30 million gallons per day for a growing population (p. 1).
How does oxygen injection reduce pipe corrosion?
Hydrogen sulfide from oxygen-starved sewage turns into sulfuric acid on pipe and concrete surfaces. Dissolved oxygen keeps bacteria from making the sulfide. The release credits the new oxygen technology with reducing pipe corrosion and extending the life of odor control (p. 2).
Who designed King County's pump station upgrade?
Stantec led the engineering and architecture for the $40 million project for the King County Wastewater Treatment Division. Mark Graham, a Stantec senior principal in Bellevue, was the project manager (pp. 1, 2).
Can odor and corrosion control count toward an Envision award?
In this project it did. The release lists the new technology that will reduce pipe corrosion and extend the life of odor control under improving public health and safety (p. 2).
What award did King County's two pump stations win?
An Envision Silver Award from the Institute for Sustainable Infrastructure, announced by Stantec on March 16, 2022. (PDF page 1) (opens in a new tab)
What odor control system did the upgrade add?
A novel oxygen injection odor and corrosion control system, installed as part of the upgrade to reduce pipe corrosion and extend the life of odor control. (PDF page 1) (opens in a new tab)
How much did the pump station upgrade cost?
$40 million, designed by Stantec for the King County Wastewater Treatment Division. (PDF page 1) (opens in a new tab)
What capacity do the upgraded pump stations have?
The system can convey a peak capacity of 30 million gallons per day, with four new pumps at each station and a new 24-inch force main. (PDF page 1) (opens in a new tab)
Which communities do the two pump stations serve?
They send sewage from Sammamish, Issaquah and Bellevue to King County's South Treatment Plant in Renton. (PDF page 1) (opens in a new tab)
The Project

King County's two pump stations
In Full
More Key Figures
Seven more, each with what it measures and its PDF page.
From the PDF
| Figure | What It Measures |
|---|---|
| 50 years | How long the pump stations had served the area ("nearly 50 years") (PDF page 1 (opens in a new tab)) |
| 250 neighbors and community members | People surveyed during design ("more than 250") (PDF page 2 (opens in a new tab)) |
| Four pumps per station | New higher-capacity vertical, extended shaft pumps at each pump station (PDF page 1 (opens in a new tab)) |
| $40 million | Cost of the upgrade of the two pump stations and their force main (PDF page 1 (opens in a new tab)) |
| 30 million gallons per day | Peak capacity the upgraded system can convey (PDF page 1 (opens in a new tab)) |
| Four pumps per station | New higher-capacity vertical, extended shaft pumps (PDF page 1 (opens in a new tab)) |
| 250 people | Neighbors and community members surveyed during design (more than) (PDF page 2 (opens in a new tab)) |
The Full Write-Up
The problem, the work, the results and who did it.
Two Pump Stations at Their Limits After Nearly 50 Years
King County's Wastewater Treatment Division (WTD) runs two pump stations that send sewage from Sammamish, Issaquah and Bellevue to its South Treatment Plant in Renton. For nearly 50 years they served the area reliably, but they were reaching their operational limits, and the population they serve keeps growing (p. 1). The force main included an old 12-inch pipe (p. 2).
Pump stations and force mains also carry a hidden cost. Sewage held in a full pipe loses its oxygen, and bacteria then make hydrogen sulfide (H₂S). The gas smells, and on pipe walls and concrete it turns into sulfuric acid that corrodes them. Odor control that treats only the foul air deals with the smell, not with the sulfide in the water.
New Pumps, a Larger Force Main & Oxygen in the Sewage
Stantec led the engineering and architecture for the $40 million project. The design installed four new higher-capacity vertical, extended shaft pumps at each station, with electrical upgrades, new roofs including a green roof at Sunset Pump Station, and new variable refrigerant flow heating, ventilating and air conditioning at both (p. 1). A new 24-inch force main replaced the old 12-inch pipe (p. 2).
At the second station the project added what the release calls a novel oxygen injection odor and corrosion control system (p. 1). Adding oxygen treats the cause rather than the smell: with dissolved oxygen in the flow, bacteria do not turn sulfate into sulfide, so less H₂S forms to escape or to turn into acid. The release does not describe the equipment or name its supplier. ECO₂ lists the project among its installations, and the project page is linked from this entry.
The ground around the stations was part of the design too: restoration of the Lake Sammamish shoreline below Sunset Pump Station, habitat restoration at the second station, and enhancement of wetland (p. 2).
An Envision Silver Award for Sustainability, Equity & Resilience
The Institute for Sustainable Infrastructure named the project an Envision Silver Award winner, announced on March 16, 2022. The award highlights projects that encourage sustainable, equitable and resilient design, construction, operations and maintenance. The upgraded system can convey a peak of 30 million gallons per day (p. 1).
The release lists four groups of achievements behind the award. Protecting the natural world: restored habitat, floodplain water quality maintained, undeveloped land preserved, only native vegetation, invasive species removed. Involving stakeholders: more than 250 neighbors and community members surveyed during design, with their input reflected in the final design. A sustainability management system: manufacturers asked for their sustainability policies, an internal scorecard and an equity plan. And public health and safety: a more reliable sewage system, and the new technology that will reduce pipe corrosion and extend the life of odor control (p. 2).
Stantec Designed It for King County's Wastewater Treatment Division
Stantec, a global design firm, led the engineering and architecture for the King County Wastewater Treatment Division, which owns the stations and the South Treatment Plant (p. 1). Mark Graham, Stantec senior principal and project manager in Bellevue, says it was very satisfying to help the WTD make needed upgrades while focusing on sustainability. Kamuron Gurol, WTD Division Director, says the investment lets the county keep protecting public health and the environment (p. 2). Stantec issued the release (p. 1).
What It Means for a Utility Planning a Pump Station Upgrade
A pump station upgrade is a natural moment to deal with sulfide. King County added oxygen injection in the same project as new pumps and a new force main, and the release counts it among the public health and safety gains behind a sustainability award (pp. 1, 2).
For an engineer, the point is where the treatment acts. Oxygen in the sewage protects the pipe itself and leaves less H₂S for air treatment downstream. The release gives no performance data, so look to ECO₂'s force main case studies, linked below, for measured results.
Written up from the technical paper. Every figure is as the technical paper prints it, with the PDF page it comes from; the authors' own words appear only in quotation marks.
How to Cite
One line to paste into a report.
Stantec. King County’s Sunset and Heathfield Pump Stations Earn Envision® Silver Award. Stantec, March 2022. Project engineer: King County Wastewater Treatment Division, Mark Graham, Stantec. Eco Oxygen Technologies Technical Library. https://eco2tech.com/technical-library/king-countys-sunset-and-heathfield-pump-stations-earn-envision-silver-award/
https://eco2tech.com/technical-library/king-countys-sunset-and-heathfield-pump-stations-earn-envision-silver-award/
The Next Step
Ask an ECO₂ Engineer
Questions about this technical paper, or about your own water? An application engineer answers, with the figures.