
34 Years of Successful ECO₂ Projects
63 projects with Speece Cone® Superoxygenation, in sewers, treatment plants, lakes, reservoirs and rivers, across municipal and industrial applications.
01Project Map By the Numbers
See Where They Are Where We Work
Each dot is a project, sized by its oxygen capacity.
Dot size, lbs/day1001,00010,00040,000Capacity not listed
Not on the map
63
projects
Point at a dot, or tap one, to see the project.
Over 100 systems installed across 63 projects.
Source: ECO₂ reference list
02For the Experience Clause
Filter the List to Your Project
Specifications often ask for 5 to 15 similar systems in service for 2 to 5 years. Search, filter and sort the projects to match.

Rock Creek Pump Station
After the city's first ECO₂ system succeeded, a similar system was designed for its other influent force main.
See the Project
Rock Creek Pump Station
Broomfield, ColoradoWastewater Odor Control · 400 lbs/dayGem Lakes and Woodside Pump Stations
Odor is consistently eliminated at all high points and at the discharge of the force main.
See the ProjectGem Lakes and Woodside Pump Stations
Aiken, South CarolinaWastewater Odor Control · 360 lbs/day
Elk Vale Lift Station
An oversized force main causes high retention times and high H₂S formation.
See the Project
Elk Vale Lift Station
Rapid City, South DakotaWastewater Odor Control · 300 lbs/day
Industrial Wastewater Treatment
The wetland constructed for treating industrial wastewater from a large manufacturing facility was designed with the ECO₂ system for nitrification.
See the Project
Industrial Wastewater Treatment
Bay City, MichiganConstructed Wetlands · 266 lbs/day
Maplewood Road Pump Station
The H₂S level at the force main discharge is consistently near zero, and plant upsets from high BOD surges have been prevented.
See the Project
Maplewood Road Pump Station
Windsor, OntarioWastewater Odor Control · 260 lbs/day
Aquifer Restoration Site
The ECO₂ system adds dissolved oxygen so aerobic bacteria can break down the contaminant sulfolane in groundwater.
See the Project
Aquifer Restoration Site
Lathrop, CaliforniaGroundwater Remediation · 250 lbs/day
Middle Tributary Lift Station
Since installing the ECO₂ system, the city has observed improved results and significant savings over the use of chemical treatment.
See the Project
Middle Tributary Lift Station
Colorado Springs, ColoradoWastewater Odor Control · 215 lbs/day
Lift Station D
The ECO₂ system is designed to satisfy the oxygen demand of the entire force main to prevent septic conditions.
See the Project
Lift Station D
Delhi Township, MichiganWastewater Odor Control · 200 lbs/day
HRSD SWIFT Research Center
SWIFT's engineers chose the Speece Cone to raise dissolved oxygen in advanced water treatment without breaking pressure.
See the Project
HRSD SWIFT Research Center
Suffolk, VirginiaAdvanced Treatment · 100 lbs/day
Torrington Prison Lift Station
A new prison built near the small town of Torrington, WY more than doubled the town's population.
See the Project
Torrington Prison Lift Station
Torrington, WyomingWastewater Odor Control · 100 lbs/day
Twin Street Lift Station
This small diameter ECO₂ system adds dissolved oxygen to the force main to prevent septic conditions and the formation of H₂S.
See the Project
Twin Street Lift Station
Brownsburg, IndianaWastewater Odor Control · 100 lbs/day
Pump Station 1
With low flows and long retention times, this pump station was the ideal location for Superoxygenation.
See the Project
Pump Station 1
Scarborough, MaineWastewater Odor Control · 80 lbs/day
03The Next Step
Writing the Specification?
The design data checklists and the papers to cite are on the For Engineers page. Send your site data through the contact form, or see a system installed first in the System Animation. ECO₂ returns a budgetary price.
