
34 Years of Successful ECO₂ Projects
63 projects with Speece Cone® Superoxygenation, in sewers, treatment plants, lakes, reservoirs and rivers, across municipal and industrial applications.
01Project Map By the Numbers
See Where They Are Where We Work
Each dot is a project, sized by its oxygen capacity.
Dot size, lbs/day1001,00010,00040,000Capacity not listed
Not on the map
63
projects
Point at a dot, or tap one, to see the project.
Over 100 systems installed across 63 projects.
Source: ECO₂ reference list
02For the Experience Clause
Filter the List to Your Project
Specifications often ask for 5 to 15 similar systems in service for 2 to 5 years. Search, filter and sort the projects to match.

Bluebird Lift Station
The ECO₂ system oxygenates raw wastewater at the Bluebird Lift Station, preventing H₂S, odors and corrosion in the force main.
See the Project
Bluebird Lift Station
Laguna Beach, CaliforniaWastewater Odor Control · 1,000 lbs/day
Ethanol Plant Wastewater Lift Station
A new ethanol plant required the construction of a dedicated lift station to transfer wastewater to the municipal treatment plant.
See the Project
Ethanol Plant Wastewater Lift Station
Fort Dodge, IowaWastewater Odor Control · 1,000 lbs/day
Gulf Pond Pump Station
The City of Milford has a long sewer force main which discharges near the treatment plant.
See the Project
Gulf Pond Pump Station
Milford, ConnecticutWastewater Odor Control · 1,000 lbs/day
Industrial Wastewater Lift Station
An industrial area in Dayton, OH contains several corn processing facilities which discharge high temp, high strength wastewater to the city.
See the Project
Industrial Wastewater Lift Station
Dayton, OhioWastewater Odor Control · 1,000 lbs/day
Machado Lake
The City of Los Angeles installed an ECO₂ system at Machado Lake to reduce algae, ammonia, odors and pollution.
See the Project
Machado Lake
Los Angeles, CaliforniaReservoir Water Quality · 1,000 lbs/day
Multiple Pump Stations
The City of Scottsdale’s wastewater collection system consists of five (5) force mains piped to their two main Water Reclamation Facilities.
See the Project
Multiple Pump Stations
Scottsdale, ArizonaWastewater Odor Control · 1,000 lbs/day
SSU Force Main
The Villages was experiencing extremely high H₂S spikes at ARVs on a long sewer force main.
See the Project
SSU Force Main
The Villages, FloridaWastewater Odor Control · 1,000 lbs/day
White Rock Pump Station
The D.O. carryover from the force main reduces H₂S up to 5 miles downstream in the gravity line.
See the Project
White Rock Pump Station
Vancouver, British ColumbiaWastewater Odor Control · 1,000 lbs/day
South West Regional Pump Station
The City of Murfreesboro had significant odor and corrosion at their WWTP from high H₂S.
See the Project
South West Regional Pump Station
Murfreesboro, TennesseeWastewater Odor Control · 970 lbs/day
Owen Good Pump Station
The City of Raymore has a few oversized sewer force mains, designed for future growth.
See the Project
Owen Good Pump Station
Raymore, MissouriWastewater Odor Control · 955 lbs/day
Chisholm Creek Lift Station
The Speece Cone system dissolves enough oxygen to sustain aerobic conditions, reducing H₂S release along the force main.
See the Project
Chisholm Creek Lift Station
Edmond, OklahomaWastewater Odor Control · 915 lbs/day
Regional Lift Station
Riverside requires the flow from Jurupa to be treated for H₂S before entering the regional Water Quality Control Plant.
See the Project
Regional Lift Station
Jurupa, CaliforniaWastewater Odor Control · 850 lbs/day
03The Next Step
Writing the Specification?
The design data checklists and the papers to cite are on the For Engineers page. Send your site data through the contact form, or see a system installed first in the System Animation. ECO₂ returns a budgetary price.
