34 Years of Successful ECO₂ Projects
63 projects with Speece Cone® Superoxygenation, in sewers, treatment plants, lakes, reservoirs and rivers, across municipal and industrial applications.
01Project Map By the Numbers
See Where They Are Where We Work
Each dot is a project, sized by its oxygen capacity.
Dot size, lbs/day1001,00010,00040,000Capacity not listed
Not on the map
63
projects
Point at a dot, or tap one, to see the project.
Over 100 systems installed across 63 projects.
Source: ECO₂ reference list
02For the Experience Clause
Filter the List to Your Project
Specifications often ask for 5 to 15 similar systems in service for 2 to 5 years. Search, filter and sort the projects to match.

Marston Reservoir
Denver Water installed an ECO₂ System for hypolimnetic oxygenation of the Marston Drinking Water Reservoir.
See the Project
Marston Reservoir
Denver, ColoradoReservoir Water Quality · 2,200 lbs/day
Paper Mill Wastewater Treatment Plant
Treated wastewater from the Weyerhaeuser Paper Mill is pumped over 5 miles to the outfall at a small creek.
See the Project
Paper Mill Wastewater Treatment Plant
Valliant, OklahomaEffluent D.O. · 2,200 lbs/day
Inland Empire Paper Mill Force Main and Primary Clarifiers
The Inland Empire Paper Mill considered many options for controlling H₂S at the wastewater treatment plant's primary clarifier.
See the Project
Inland Empire Paper Mill Force Main and Primary Clarifiers
Spokane, WashingtonWastewater Odor Control · 2,100 lbs/day
Grand Rapids Paper Mill Force Main and Primary Clarifiers
The City of Grand Rapids and the local Paper Mill searched for an effective solution to stop odors at the city's WWTP for decades.
See the Project
Grand Rapids Paper Mill Force Main and Primary Clarifiers
Grand Rapids, MinnesotaH₂S Prevention, Primary Clarifier Sulfide Removal · 1,950 lbs/day
Barbour Lane Pump Station
The District treated H₂S for years, but traditional chemicals have a limited effectiveness against corrosion and have a high cost.
See the Project
Barbour Lane Pump Station
Louisville, KentuckyWastewater Odor Control · 1,900 lbs/day
Forks of the River Force Main
One system is located at the beginning of the force main, and the second is located at the midpoint.
See the Project
Forks of the River Force Main
Knoxville, TennesseeWastewater Odor Control · 1,650 lbs/day
Parkway-A Force Main
The City of St. Joseph chose the ECO₂ system to prevent septic conditions and odors along one of its busiest roads.
See the Project
Parkway-A Force Main
St. Joseph, MissouriWastewater Odor Control · 1,580 lbs/day
Carter's Creek and Theta Pike Lift Stations
The City of Columbia has two long sewer force mains subject to high sulfide generation.
See the Project
Carter's Creek and Theta Pike Lift Stations
Columbia, TennesseeWastewater Odor Control · 1,450 lbs/dayPark City and Bel Aire Pump Stations
H₂S odors and corrosion are prevented for the total length and the discharge of each force main.
See the ProjectPark City and Bel Aire Pump Stations
Wichita area, KansasWastewater Odor Control · 1,255 lbs/day
Lift Station 28
An ECO₂ system at Lift Station 28 treats the 20 inch, 3 mile force main, preventing H₂S and reducing odors at the plant.
See the Project
Lift Station 28
St. Petersburg, FloridaWastewater Odor Control · 1,100 lbs/day
Paper Mill Primary Clarifier
The ECO₂ System replaced the chemical feed system by maintaining aerobic conditions in the clarifier, to prevent H₂S.
See the Project
Paper Mill Primary Clarifier
Madison, MainePrimary Clarifier Sulfide Removal · 1,100 lbs/day
Leucadia Force Main
The District was experiencing extremely high H₂S spikes at a high-end resort and golf course, where a force main discharges into a gravity junction.
See the Project
Leucadia Force Main
Carlsbad, CaliforniaWastewater Odor Control · 1,030 lbs/day
03The Next Step
Writing the Specification?
The design data checklists and the papers to cite are on the For Engineers page. Send your site data through the contact form, or see a system installed first in the System Animation. ECO₂ returns a budgetary price.