34 Years of Successful ECO₂ Projects
63 projects with Speece Cone® Superoxygenation, in sewers, treatment plants, lakes, reservoirs and rivers, across municipal and industrial applications.
01Project Map By the Numbers
See Where They Are Where We Work
Each dot is a project, sized by its oxygen capacity.
Dot size, lbs/day1001,00010,00040,000Capacity not listed
Not on the map
63
projects
Point at a dot, or tap one, to see the project.
Over 100 systems installed across 63 projects.
Source: ECO₂ reference list
02For the Experience Clause
Filter the List to Your Project
Specifications often ask for 5 to 15 similar systems in service for 2 to 5 years. Search, filter and sort the projects to match.
King County's two pump stations
An ECO₂ system was part of a large project to upgrade the pump station, which earned King County an Envision Silver Award.
See the ProjectKing County's two pump stations
Seattle, WashingtonWastewater Odor Control · 840 lbs/day
Lower Salada Lift Station
After the success of their first ECO₂ project in 2008, a similar system was installed at the next downstream lift station.
See the Project
Lower Salada Lift Station
Moulton Niguel, CaliforniaWastewater Odor Control · 800 lbs/day
Northlands Pump Station
A new force main was constructed from the Northlands Pump Station, designed to treat future flow rates.
See the Project
Northlands Pump Station
Broomfield, ColoradoWastewater Odor Control · 780 lbs/day
Spring Creek Lift Station
The Speece Cone system dissolves enough oxygen to sustain aerobic conditions throughout the force main, reducing H₂S formation and release.
See the Project
Spring Creek Lift Station
Edmond, OklahomaWastewater Odor Control · 775 lbs/day
Port Wentworth Wastewater Plant
The city chose ECO₂'s technology for its low cost, small footprint, and ease of use.
See the Project
Port Wentworth Wastewater Plant
Port Wentworth, GeorgiaEffluent BOD Offset · 650 lbs/day
Veterans Memorial Force Main
To prevent high H₂S at the plant headworks, an oxygenation system was installed 1,000 ft upstream of the force main discharge.
See the Project
Veterans Memorial Force Main
Bowling Green, KentuckyWastewater Odor Control · 610 lbs/day
Fort Valley Wastewater Treatment Plant
The city chose to offset BOD with the ECO₂ system for a much lower cost, smaller footprint, and greater flexibility.
See the Project
Fort Valley Wastewater Treatment Plant
Fort Valley, GeorgiaEffluent BOD Offset · 560 lbs/day
Travis Field Wastewater Treatment Plant
The new Travis Field plant raises its effluent's D.O. with a Speece Cone, chosen for its efficiency and small footprint.
See the Project
Travis Field Wastewater Treatment Plant
Savannah, GeorgiaEffluent D.O. · 534 lbs/day
Chambers Reservoir
An ECO₂ system was installed on the bottom of the new reservoir, near the outlet structure before the reservoir was filled.
See the Project
Chambers Reservoir
Arapahoe County, ColoradoReservoir Water Quality · 500 lbs/day
Jackson Road Pump Station
Scio Township has a 3-mile long force main with over 8 hours of retention time making it subject to high H₂S levels.
See the Project
Jackson Road Pump Station
Ann Arbor, MichiganWastewater Odor Control · 500 lbs/day
SOCWA Lift Station
After the first system succeeded, a second ECO₂ system was installed at the next lift station upstream to prevent sulfide.
See the Project
SOCWA Lift Station
Laguna Beach, CaliforniaWastewater Odor Control · 500 lbs/day
Upper Salada Lift Station
The system effectively prevents odors and corrosion along the force main and at the discharge.
See the Project
Upper Salada Lift Station
Moulton Niguel, CaliforniaWastewater Odor Control · 500 lbs/day
03The Next Step
Writing the Specification?
The design data checklists and the papers to cite are on the For Engineers page. Send your site data through the contact form, or see a system installed first in the System Animation. ECO₂ returns a budgetary price.