City of San Diego installs ECO₂ Speece Cone® System

San Diego installs a large ECO₂ Speece Cone® system to dissolve oxygen at the bottom of Lake Hodges, to improve the lake's water, reduce algal blooms and help its plant.

Details

Shared
November 1, 2021
Category
In the Press
Lake Hodges ECO₂

The Next Step

Talk to an ECO₂ Engineer

Send your flow, pipe or reservoir data and get a budgetary price for your system. ECO₂'s engineers check the data for a technical fit, then send a system design with its estimated capital and annual operating costs, and can visit your site to confirm the data.

A Speece Cone on a work barge, ready to be lowered into San Pablo Reservoir, California

San Pablo Reservoir, California. 10,000 lbs/day.