El Paso, TX Frontera Lift Station Replaces Chemical Feed System with Oxygen

ECO₂'s case study of El Paso's Frontera Lift Station, where oxygen replaced a chemical feed system on a long dual force main to cut costs and keep H₂S low.

Details

Publisher
ECO₂

Summary

El Paso Water Utilities had high odors and corrosion at its Northwest WWTP because the 3.5-mile dual force main from the Frontera Pump Station delivered wastewater with up to 20 mg/L of H₂S. A CH2MHill study compared five odor control chemicals, ozonation and Superoxygenation, and chose the ECO₂ system on lowest life-cycle cost.

Key Figures

Questions

Why did the Northwest WWTP have odor problems?

Over 90% of its flow arrives through the 3.5-mile dual force main from the Frontera Pump Station. Retention times of over 12 hours at times produced liquid-phase H₂S of up to 20 mg/L, which caused high odors and corrosion. (PDF page 1) (opens in a new tab)

What options did El Paso compare?

CH2MHill compared five traditional odor control chemicals, ozonation and Superoxygenation. The ECO₂ system had the lowest life-cycle cost and was installed at the Frontera Pump Station, upstream of the plant. (PDF page 1) (opens in a new tab)

How does dissolved oxygen stop H₂S?

It reacts with the sulfides already present and creates aerobic conditions that stop more from forming. The system dissolves pure oxygen at an average oxygen transfer efficiency of 95%. (PDF page 2) (opens in a new tab)

The Project

Frontera Pump Station

Location
El Paso, Texas
Application
Wastewater Odor Control
Capacity
5,000 lbs/day
See the Project

In Full

More Key Figures

Four more, each with what it measures and its PDF page.

From the PDF

FigureWhat It Measures
20 mg/L
Liquid-phase H₂S before treatment (up to) (PDF page 1 (opens in a new tab))
3.5 miles
Length of the Frontera dual force main (PDF page 1 (opens in a new tab))
90%
Share of the plant's flow carried from the Frontera Pump Station (over) (PDF page 1 (opens in a new tab))
17.5 MGD
Northwest WWTP design capacity (PDF page 1 (opens in a new tab))

Full Text as Published

The text as its authors wrote it.
The case study's own words, as published. Its figures are the authors'; the PDF (2 pages) is the original, with the figures, photos and tables drawn as images.

El Paso Water Utilities operates the Northwest WWTP which was built with a 17.5 MGD capacity, but currently with an average daily flow of 9-10 MGD. Odor emissions at the plant are directly related to the wastewater entering the front end of the plant from the collection system, mainly the 3.5-mile dual force main from the Frontera Pump Station (which conveys over 90% of the plant's flow). The high HRT (over 12 hours at times) results in extremely high H2S concentrations of up to 20mg/L in the liquid phase, which causes excessively high odors and corrosion rates.

With the WWTP adjacent to the busy Interstate-10 and a new housing development, El Paso Water Utilities hired CH2MHill to study, design, and manage the construction of odor improvements at the Northwest WWTP.

Their study included a comparison of five traditional odor control chemicals, ozonation, and SuperOxygenation. Based on lowest life-cycle costs, the SuperOxygenation System by ECO₂ was chosen and installed at the Frontera Pump Station, upstream of the plant.

Pictured: SuperOxygenation System's Speece Cone Oxygen Transfer Reactor installed at Frontera Pump Station, El Paso, TX.

At 40% of the cost, the ECO₂ System lowers the average H2S level from 12 ppm with calcium nitrate feed, to 1 ppm with oxygen.

The ECO₂ SuperOxygenation System dissolves pure oxygen into wastewater at an average oxygen transfer efficiency of 95%. Dissolved Oxygen readily reacts with existing sulfides and prevents further formation of sulfides by creating aerobic conditions. Eliminating H2S not only prevents odor, but also, prevents costly corrosion of pipes and treatment plant equipment.

Chart: H2S Concentration at Discharge of Frontera Dual Force Main, March 2015 to May 2015, SuperOxygenation compared with Calcium Nitrate Feed.

How to Cite

One line to paste into a report.

El Paso, TX Frontera Lift Station Replaces Chemical Feed System with Oxygen. ECO₂. Project engineer: Jacobs (CH2M). Eco Oxygen Technologies Technical Library. https://eco2tech.com/technical-library/el-pasotx-frontera-lift-station-replaces-chemical-feed-system-with-oxygen/

https://eco2tech.com/technical-library/el-pasotx-frontera-lift-station-replaces-chemical-feed-system-with-oxygen/

The Next Step

Ask an ECO₂ Engineer

Questions about this case study, or about your own water? An application engineer answers, with the figures.

A rebuilt sewage pump station with a planted roof beside Lake Sammamish