Dissolved Oxygen 1 year time lapse

A U.S. Army Corps of Engineers time-lapse of a year of work on the Savannah Harbor Expansion Project's down-river oxygen site, from a cleared site to standing Speece Cones®.

Details

Publisher
U.S. Army Corps of Engineers
Published
March 2017
Video
YouTube, 0:57

Summary

A Year of Building, in Time-Lapse

This U.S. Army Corps of Engineers time-lapse shows the down-river site of the Savannah Harbor Expansion Project's dissolved oxygen injection system being built, from April 2016 to March 2017 (video description). A fixed camera watches a cleared riverside site fill with cranes, foundations and, by the end, Speece Cones standing on the ground.

Questions

What does the Savannah dissolved oxygen time-lapse show?

Photos of the down-river site of the dissolved oxygen injection system being built, from April 2016 to March 2017 (video description).

Which part of the Savannah Harbor Expansion Project is in the time-lapse?

The down-river site of the dissolved oxygen injection system (video description).

Are Speece Cones visible in the time-lapse?

Yes. In the later frames the cones stand in the foreground of the site, before they are set in place.

Who made the Savannah time-lapse?

Jeremy S. Buddemeier of the U.S. Army Corps of Engineers' Savannah District (video description).

The Project

Savannah Harbor Expansion

Location
Savannah, Georgia
Application
River Water Quality
Capacity
40,000 lbs/day
See the Project

In Full

The Full Write-Up

The problem, the work, the results and who did it.

Oxygen for a Deeper Harbor

The dissolved oxygen injection system is a feature of the Savannah Harbor Expansion Project (video description). As the harbor is deepened, the system adds oxygen to the Savannah River so its dissolved oxygen does not fall; the other Savannah videos and papers in the library explain the design.

What the Time-Lapse Shows

The clip opens on a title card for the dissolved oxygen injection system and the period it covers. From one camera position beside the river, the photos run through the months: earthworks across the site, cranes arriving and materials laid out, with on-screen labels marking the months as they pass.

In the later frames, Speece Cones stand in the foreground of the site, waiting to be set in place. The clip ends with a music credit.

The Down-River Site, Taking Shape

The time-lapse records progress, not performance. It shows how much civil work sits behind a river-scale oxygen system before a cone is installed: a whole riverbank site prepared, built up and served by cranes over the months it covers (video description).

The Corps' Savannah District

The U.S. Army Corps of Engineers' Savannah District published the video, which was made by Jeremy S. Buddemeier (video description).

Why It Is Worth a Minute

For an engineer or a board looking at oxygen injection on a river, the clip gives a real sense of the construction behind the cones. The fly-over videos of the finished sites show where it led.

Written up from the video. Every figure is as the video's speakers give it or its YouTube description prints it, with the moment it comes from; the speakers' own words appear only in quotation marks.

How to Cite

One line to paste into a report.

U.S. Army Corps of Engineers. Dissolved Oxygen 1 year time lapse. U.S. Army Corps of Engineers, March 2017. Project engineer: Amec Foster Wheeler, CDM Smith, U.S. Army Corps of Engineers. Eco Oxygen Technologies Technical Library. https://eco2tech.com/technical-library/dissolved-oxygen-1-year-time-lapse/

https://eco2tech.com/technical-library/dissolved-oxygen-1-year-time-lapse/

The Next Step

Ask an ECO₂ Engineer

Questions about this video, or about your own water? An application engineer answers, with the figures.

A row of stainless steel Speece Cones with ECO₂ signs on the Savannah River, Georgia