Savannah River Oxygenation System Dissolves 40,000 lbs per day of Pure Oxygen to Improve Harbor Water Quality

ECO₂'s case study of the Savannah River oxygenation system, from the barge-mounted demonstration to the full-scale system built to mitigate the harbor's low dissolved oxygen.

Details

Publisher
ECO₂
Published
2018

Summary

Deepening Savannah Harbor for larger container ships could not go ahead until the river's low dissolved oxygen was mitigated. After nearly a decade of studies and 25 technologies evaluated, a five-agency partnership selected the ECO₂ system.

Key Figures

Questions

Why did the harbor deepening need an oxygen system?

Parts of the Savannah River were already D.O. impaired, so the deepening could not proceed without a plan to mitigate the river's low dissolved oxygen. (PDF page 1) (opens in a new tab)

Who chose the technology?

A partnership of the Georgia Ports Authority, US EPA, US Fish and Wildlife Service, National Marine Fisheries Service and the Army Corps of Engineers, after nearly a decade of studies and 25 technologies evaluated. (PDF page 1) (opens in a new tab)

How large is the full-scale system?

It pumps about 150 million gallons per day of river water through two banks of 12 ft diameter Speece Cones and dissolves up to 40,000 lbs per day of pure oxygen. (PDF page 2) (opens in a new tab)

The Project

Savannah Harbor Expansion

Location
Savannah, Georgia
Application
River Water Quality
Capacity
40,000 lbs/day
See the Project

In Full

More Key Figures

Four more, each with what it measures and its PDF page.

From the PDF

FigureWhat It Measures
2015
Year CDM Smith was awarded the prime contract for the full-scale project (PDF page 2 (opens in a new tab))
22 MGD
Side stream treated in the demonstration (PDF page 2 (opens in a new tab))
25 technologies
Options evaluated before the ECO₂ system was selected (PDF page 1 (opens in a new tab))
10,000 square miles
Savannah River basin area (over) (PDF page 1 (opens in a new tab))

Full Text as Published

The text as its authors wrote it.
The case study's own words, as published. Its figures are the authors'; the PDF (2 pages) is the original, with the figures, photos and tables drawn as images.

ECO₂ Selected to Resolve Low-D.O. Harbor

The Savannah River Harbor is home to one of the country's busiest industrial ports. The Savannah River basin includes over 10,000 square miles in the states of Georgia, South Carolina, and North Carolina.

The Georgia Ports Authority made the decision to deepen the Savannah Harbor to allow passage of new, larger container ships coming to the US East-Coast through the Panama Canal. However, since parts of Savannah River were already considered "D.O.-Impaired," the project to deepen the Harbor could not proceed without a plan to mitigate the river's low dissolved oxygen levels (D.O.).

A partnership of five entities was tasked with finding a solution:

  • Georgia Ports Authority
  • US EPA
  • US Fish and Wildlife Service
  • National Marine Fisheries Service
  • The Army Corps of Engineers.

After nearly a decade of engineering studies and evaluating 25 different technologies, the ECO₂ system was rated the best, and selected for a large-scale demonstration project, prior to full-scale implementation.

See the reverse side of this page for more details on both projects:

  • Demonstration project
  • Full-scale Harbor expansion and re-oxygenation.

Demonstration Project: Harbor Re-Oxygenation

MACTEC Engineering & Consulting (now Wood) was awarded a contract with the Georgia Ports Authority to design and implement a large-scale demonstration project using the ECO₂ Speece Cone technology. Built and deployed in 2008, the stationary barge-mounted ECO₂ system was successful in dissolving up to 30,000 lbs per day of pure oxygen into a 22 MGD side stream on the Savannah River.

Water quality testing was performed before, during, and after the demonstration project to evaluate habitat improvement for fish and other aquatic species, and to further define the oxygen demand for the project.

Demonstration Project: Two Speece Cones Installed on Stationary Barge

Full-Scale Project: Harbor Expansion and Re-Oxygenation

In 2015, CDM Smith was awarded the prime contract for the full-scale oxygenation project. Construction began in 2016 with completion by the end of 2019.

The system includes equipment to pump approximately 150 million gallons per day of river water through two banks of 12-ft diameter Speece Cones, which dissolve a total of up to 40,000 lbs per day of pure oxygen. The oxygen-rich water will compensate for the reduced oxygen levels resulting from the harbor deepening. This project is the largest water oxygenation effort to date.

Up River Installation 8x 12 ft Diameter Speece Cones

How to Cite

One line to paste into a report.

Savannah River Oxygenation System Dissolves 40,000 lbs per day of Pure Oxygen to Improve Harbor Water Quality. ECO₂, 2018. Project engineer: CDM, U.S. Army Corps of Engineers. Eco Oxygen Technologies Technical Library. https://eco2tech.com/technical-library/savannah-river-oxygenation-system-dissolves-40000-lbs-per-day-of-pure-oxygen-to-improve-harbor-water-quality/

https://eco2tech.com/technical-library/savannah-river-oxygenation-system-dissolves-40000-lbs-per-day-of-pure-oxygen-to-improve-harbor-water-quality/

The Next Step

Ask an ECO₂ Engineer

Questions about this case study, or about your own water? An application engineer answers, with the figures.

A row of stainless steel Speece Cones with ECO₂ signs on the Savannah River, Georgia