Fort Valley, GA Post-Treatment Oxygenation For Net-Zero Ultimate BOD Discharge

ECO₂'s case study of Fort Valley, Georgia, which raises its plant effluent's dissolved oxygen to offset the BOD it discharges, for a net-zero ultimate BOD permit.

Details

Publisher
ECO₂
Engineer
Carter & Sloope

Summary

A new Georgia permit required Fort Valley's wastewater plant to add up to 316 lbs of oxygen per day to its effluent before discharge to Bay Creek. Instead of spending about $2 million on tertiary treatment or reverse osmosis, the city offsets 10 mg/L of BOD and ammonia with dissolved oxygen from an ECO₂ Superoxygenation system. The system cost less than 20% of the tertiary option and runs only when effluent flow rises above about 1.3 MGD.

Key Figures

Questions

What did Fort Valley's new permit require?

The State of Georgia required the plant to add up to 316 lbs of oxygen per day to its effluent, which discharges to Bay Creek, a small receiving creek. (PDF page 1) (opens in a new tab)

What options did the city have?

Spend about $2 million more on tertiary treatment or reverse osmosis to bring BOD below 10 mg/L, or offset the 10 mg/L of BOD and ammonia with dissolved oxygen. The city chose the oxygen route with ECO₂'s Superoxygenation technology. (PDF page 1) (opens in a new tab)

How is the system arranged at the plant?

Space was limited, so the system draws from a new overflow wet well. When effluent flow rises above about 1.3 MGD, the extra flow collects in the wet well, the system oxygenates it, and it rejoins the main effluent at the outfall. (PDF page 2) (opens in a new tab)

How did the cost compare with tertiary treatment?

The ECO₂ system cost less than 20% of the tertiary treatment equipment that would otherwise have been required. (PDF page 2) (opens in a new tab)

What does net-zero ultimate BOD discharge mean here?

The system adds enough dissolved oxygen to the effluent to offset any residual BOD and ammonia, so the discharge has a net zero impact on Bay Creek and the city meets its permit. (PDF page 2) (opens in a new tab)

The Project

Fort Valley Wastewater Treatment Plant

Location
Fort Valley, Georgia
Application
Effluent BOD Offset
Capacity
560 lbs/day
See the Project

In Full

More Key Figures

Two more, each with what it measures and its PDF page.

From the PDF

FigureWhat It Measures
1.3 MGD
Effluent flow above which the ECO₂ system runs (about) (PDF page 2 (opens in a new tab))
20%
ECO₂ system cost relative to the tertiary treatment equipment (less than) (PDF page 2 (opens in a new tab))

Full Text as Published

The text as its authors wrote it.
The case study's own words, as published. Its figures are the authors'; the PDF (2 pages) is the original, with the figures, photos and tables drawn as images.

Net-Zero Ultimate BOD Discharge

The City of Fort Valley, GA is located near Macon, GA. The City operates a return-activated sludge, extended aeration wastewater treatment plant and discharges into Bay Creek, a small receiving creek. At lower flows, the plant operators are able to meet their stringent permit requirements but due to the arrangement of the plant, have trouble adding the required oxygen above 1.3 MGD of effluent flow.

The State of Georgia issued a new permit requiring the wastewater treatment plant to add up to 316 lbs of oxygen per day to the plant effluent. The City was faced with two options; 1) spend an additional ~$2 million on tertiary treatment systems or reverse osmosis equipment to reduce the BOD to below 10 mg/L; or 2) offset the 10 mg/L of BOD and ammonia with dissolved oxygen (D.O.).

The City chose ECO₂'s SuperOxygenation technology to add the required amount of D.O. because of the low cost compared to tertiary treatment equipment and the high oxygen transfer efficiency. With the addition of the ECO₂ system, the plant could operate reliably, and with little operator intervention, to meet the net zero ultimate BOD discharge permit by offsetting the 10 mg/L of BOD and ammonia with D.O. for a net zero impact on Bay Creek.

ECO₂ System and 12 Pack of Oxygen Cylinders.

Project History

New TMDL Regulations

Under Section 303(d) of the Clean Water Act, every state sets its own water quality standards designed to protect, restore and preserve water quality. When a body of water fails to meet water quality standards after application of required technology-based controls, the Clean Water Act requires the state to place it on a list of "impaired" water bodies and to prepare a TMDL analysis. TMDL requirements should guarantee an optimal environment for the aquatic ecosystem. The D.O. concentration in surface water has a direct and strong impact on the biological life resident therein, affecting the strength and stamina of fish and other aquatic species.

Design

The existing layout of the Fort Valley WWTP had limited space available to install a system to add additional oxygen. The final process before effluent discharge is chlorination/dechlorination. The consulting engineer considered placing the system upstream, midstream, and downstream of the contact chamber, any of which arrangements would have been suitable. In the end, an overflow arrangement was chosen to allow the ECO₂ system to operate on an as needed basis during periods of high flow which required additional oxygen to be added.

The ECO₂ system receives flow from a newly constructed over flow wet well. When plant effluent flow rises above ~1.3 MGD, the additional portion is collected in the wet well. When the level in the wet well is sufficient for pump operation, the system activates and adds oxygen to the effluent, which is then combined with the original effluent flow at the plant outfall.

Project Results

In order to achieve the required D.O. levels in their plant effluent, the City of Fort Valley chose the ECO₂ SuperOxygenation Technology to efficiently and affordably meet their permit requirements.

Costs for the ECO₂ System were less than 20% that of otherwise required tertiary treatment equipment.

Using the Net-Zero Ultimate Oxygen Demand is an economically feasible, yet responsible approach to meeting TMDL guidelines and improving water quality.

The ECO₂ System adds enough D.O. to the plant's effluent to off-set any residual BOD—which enabled the City to meet their discharge permit.

How to Cite

One line to paste into a report.

Fort Valley, GA Post-Treatment Oxygenation For Net-Zero Ultimate BOD Discharge. ECO₂. Project engineer: Carter & Sloope. Eco Oxygen Technologies Technical Library. https://eco2tech.com/technical-library/fort-valley-ga-post-treatment-oxygenation-for-net-zero-ultimate-bod-discharge/

https://eco2tech.com/technical-library/fort-valley-ga-post-treatment-oxygenation-for-net-zero-ultimate-bod-discharge/

The Next Step

Ask an ECO₂ Engineer

Questions about this case study, or about your own water? An application engineer answers, with the figures.

A stainless steel Speece Cone with its side stream pump and controls at a fenced pump station among pine trees