Broomfield, CO Northlands Force Main Odor and Corrosion Control
ECO₂'s case study of Broomfield, Colorado's new Northlands force main, where ECO₂ oxygenation was chosen to keep H₂S from forming, with very little maintenance.
Details
Summary
Broomfield, Colorado, and its consultant Burns & McDonnell chose ECO₂ oxygenation to keep H₂S from forming in the new Northlands force main, which was built in phases for flows from 0.4 to 5.4 MGD. Since the system started in 2013, H₂S has been consistently non-detectable at every air release valve and at the force main discharge, with very little maintenance.
Key Figures
0.4 to 5.4MGD
Design flow range the system covers, Phase 1 to Phase 2 Source: PDF page 2 (opens in a new tab)
780lbs O₂ a day
Maximum oxygen feed rate Source: PDF page 2 (opens in a new tab)
142ppm
Dissolved oxygen measured at the sidestream outlet Source: PDF page 2 (opens in a new tab)
Questions
Why did Broomfield, CO choose oxygen for its Northlands force main?
Burns & McDonnell evaluated liquid and vapor phase technologies and found oxygenation the most suitable way to prevent H₂S forming in the new force main, protecting air release valves, the discharge and new structures from odor and corrosion. (PDF page 2) (opens in a new tab)
How does the Broomfield system handle a wide range of flows?
It monitors the force main flow, calculates an instantaneous retention time and doses the dissolved oxygen needed, covering Phase 1 flow of 0.4 MGD to Phase 2 flow of 5.4 MGD with a maximum feed of 780 lbs of oxygen a day. (PDF page 2) (opens in a new tab)
What H₂S levels has Broomfield seen since installing Superoxygenation?
Since startup in 2013, H₂S has been consistently non-detectable at all air release valves and at the force main discharge. (PDF page 2) (opens in a new tab)
Where does the oxygen for the Broomfield system come from?
High purity oxygen is made on site from ambient air with an oxygen generator; transfer efficiency has tested over 90%. (PDF page 2) (opens in a new tab)
The Projects

Northlands Pump Station

Rock Creek Pump Station
In Full
More Key Figures
Three more, each with what it measures and its PDF page.
From the PDF
| Figure | What It Measures |
|---|---|
| 90% | Oxygen transfer efficiency over a variety of operating conditions ("over 90%") (PDF page 2 (opens in a new tab)) |
| 4 hours | Maximum hydraulic retention time in the force main (PDF page 2 (opens in a new tab)) |
| 2013 | Year the system started; H₂S has been non-detectable since (PDF page 2 (opens in a new tab)) |
Full Text as Published
The text as its authors wrote it.
Broomfield, CO: Northlands force main odor and corrosion control
- Technology: Oxygen for H₂S prevention
- Application: Sewer force main
- Location: Broomfield, Colorado
- Consultant: Burns & McDonnell
- Objectives: Prevent odors, protect infrastructure, cover wide range of flows
Nestled between Denver and Boulder, Broomfield, Colorado is a beautiful city with tree-lined streets and stunning views of the Rocky Mountains. With excellent schools and several large companies calling Broomfield home, the city was named #25 of the country's "Best Places to Live" in 2016, by Money Magazine.
With a growing population and expanding neighborhoods, the City and County of Broomfield hired consultant firm Burns & McDonnell to design and build a new lift station and force main for the Northlands neighborhood.
During the design of the proposed force main, there was a great concern about hydrogen sulfide (H₂S) formation and odorous releases at Air Release Valves (ARV's) and at the discharge of the force main.
Additionally, protection of the new structures, like transition manholes, against corrosion was important to the City and County for realizing the life expectancy of their new investment.
System description
Burns & McDonnell performed an internal evaluation of liquid and vapor phase technologies and determined that oxygenation would be the most suitable technology for preventing formation of H₂S in this new system. The new force main was to be built in phases to accommodate increasing flows over the coming years.
The system by ECO₂ was chosen and designed to be flexible enough to treat the wide range of design conditions listed below.
| Design condition | Value |
|---|---|
| Phase 1 flow | 0.4 MGD |
| Phase 2 flow | 5.4 MGD |
| Phase 1 FM size | 10" x 10,000 ft |
| Phase 2 FM size | 18" x 19,800 ft |
| Static head press. | 192 ft of head |
| Max. HRT | 4 hrs |
| ECO₂ cone size | 3' diam x 12' tall |
| Max. O₂ feed rate | 780 lbs/day |
| Sidestream flow | 700 gpm |
Results
The ECO₂ system was installed in 2013 to effectively monitor the force main flow rate, calculate an instantaneous hydraulic retention time (HRT), and introduce the necessary amount of dissolved oxygen (D.O.) to the force main flow, for the prevention of H₂S.
The photo in the PDF shows the high D.O. content measured at the sidestream outlet (achievable with high force main pressure): 142 ppm.
High purity oxygen gas is made on-site using ambient air, with an oxygen generator. The oxygen transfer efficiency of the ECO₂ System has been tested over a variety of operating conditions, yielding efficiencies over 90%.
Since startup, H₂S levels are consistently non-detectible at all ARV's and at the discharge of the force main. The system has been successfully operating with very little maintenance since 2013. The City is currently working on plans for a second ECO₂ system at another force main location.
How to Cite
One line to paste into a report.
Broomfield, CO Northlands Force Main Odor and Corrosion Control. ECO₂. Project engineer: Burns & McDonnell. Eco Oxygen Technologies Technical Library. https://eco2tech.com/technical-library/broomfield-co-northlands-force-main-odor-and-corrosion-control/
https://eco2tech.com/technical-library/broomfield-co-northlands-force-main-odor-and-corrosion-control/
The Next Step
Ask an ECO₂ Engineer
Questions about this case study, or about your own water? An application engineer answers, with the figures.