St. Joseph, Missouri had sewer odors along Parkway A near Mark Twain Elementary School, and chemicals added at the Faraon Street Pump Station were not enough, especially in dry weather. With consultant Burns & McDonnell, the city installed a 4 ft Speece Cone® at the pump station that delivers around 1,600 pounds of dissolved oxygen per day through a 1,400 gpm side stream driven by a 12 horsepower pump, keeping the 24 inch, 10,560 ft force main aerobic.
Key Figures
1,600lbs/day
Dissolved oxygen the Speece Cone delivers (around) Source: PDF page 2 (opens in a new tab)
1,400gpm
Carrier stream through the cone (only) Source: PDF page 2 (opens in a new tab)
12hp
Side stream pump that takes wastewater from the force main to the cone and back Source: PDF page 2 (opens in a new tab)
Questions
What was the problem on Parkway A?
Sewer odors along the parkway near Mark Twain Elementary School; chemicals added at the Faraon Street Pump Station were not enough, especially in dry weather. (PDF page 1) (opens in a new tab)
What system was installed?
A 4 ft diameter Speece Cone at the Faraon Street Pump Station, with a 12 horsepower side stream pump and bulk liquid oxygen storage, delivering around 1,600 pounds of dissolved oxygen per day. (PDF page 2) (opens in a new tab)
Does the system add air or bubbles to the sewer?
No. Only dissolved oxygen is blended back into the force main, in the amount needed to keep the whole length aerobic. (PDF page 2) (opens in a new tab)
Who was the consultant?
Burns & McDonnell, on its third project with ECO₂ after Colorado Springs and Broomfield, Colorado. (PDF page 2) (opens in a new tab)
The Project

Parkway-A Force Main
In Full
More Key Figures
Four more, each with what it measures and its PDF page.
From the PDF
| Figure | What It Measures |
|---|---|
| 4 ft | Speece Cone diameter (PDF page 2 (opens in a new tab)) |
| 24 inch | Force main diameter (PDF page 2 (opens in a new tab)) |
| 10,560 ft | Force main length treated (PDF page 2 (opens in a new tab)) |
| 3 million gallons/day | Force main flow (over) (PDF page 2 (opens in a new tab)) |
Full Text as Published
The text as its authors wrote it.
City of St. Joseph, Missouri: Parkway A Odor Control Project
The City of St. Joseph, Missouri is the county seat of Buchanan County and the eighth largest city in Missouri with approximately 77,176 residents as of 2012. St. Joseph is the central service provider for a seven-county area of northwest Missouri and north east Kansas with a combined population of over 155,000.
Jesse James Home and Museum St. Joseph, MO
St. Joseph is located roughly 30-miles north of Kansas City, MO and approximately 125-miles south of Omaha, NE. The town has a rich history that includes Jesse James and the birthplace of the Pony Express.
The purpose of the Parkway A Odor Control Project was to address odors originating from the sewer system along the parkway in the vicinity of Mark Twain Elementary School. Chemicals to reduce odors were being added at the Faraon Street Pump Station. The chemical addition proved to not be sufficient to control the problem, especially during the periods of dry weather.
Mark Twain Elem. School
- Technology: Pure Dissolved Oxygen for H₂S Prevention
- Application: Sewer Force Main
- Location: St. Joseph, Missouri
- Consultant: Burns & McDonnell
- Objectives: Prevent Odors; Protect Infrastructure
Force Main H₂S Prevention System
In the August 2, 2018 issue of the City Link (a publication of the City), the City stated the ECO₂ oxygenation system "is both more effective and economical than the current approach in controlling odors."
The consultant for the Parkway A Project was Burns & McDonnell; this is the third project in collaboration with this firm- Colorado Springs, CO and Broomfield, CO- being the first two.
The project details are as follows:
- 24-inch force main diameter
- 10,560-feet force main length
- Over 3 million gallons per day
Results
The resulting ECO₂ system sized specifically for this project and installed at the Faraon Street Pump Station was a 4-ft diameter Speece Cone capable of delivering around 1,600 pounds of dissolved oxygen per day via a carrier stream of only 1,400 gallons per minute (gpm). The side stream pump, which brings raw wastewater from the force main pipe to the Speece Cone and right back into the force main pipe, was only a 12-horsepower pump. Ancillary components included a bulk liquid oxygen storage tank, vaporizer, and other associated oxygen storage equipment. The system dissolves just the precise amount of pure oxygen to maintain aerobic conditions in the entire length of the force main. Only dissolved oxygen is blended back into the force main, no air or bubbles are introduced into the sewer system. The system has been effectively preventing H₂S since 2018.
How to Cite
One line to paste into a report.
St. Joseph, MO Finds the Best Solution for Sewer Odors and Corrosion. ECO₂. Project engineer: Burns & McDonnell. Eco Oxygen Technologies Technical Library. https://eco2tech.com/technical-library/st-joseph-mo-finds-the-best-solution-for-sewer-odors-and-corrosion/
https://eco2tech.com/technical-library/st-joseph-mo-finds-the-best-solution-for-sewer-odors-and-corrosion/
The Next Step
Ask an ECO₂ Engineer
Questions about this case study, or about your own water? An application engineer answers, with the figures.