Resumo

St. Joseph, Missouri, tinha odor de esgoto ao longo da Parkway A, perto da Mark Twain Elementary School, e os produtos químicos adicionados na Faraon Street Pump Station não bastavam, sobretudo em tempo seco. Com a consultoria Burns & McDonnell, a cidade instalou, com 4 pés de diâmetro, um Speece Cone® na estação elevatória, que fornece cerca de 1.600 libras de oxigênio dissolvido por dia por meio de uma corrente lateral de 1.400 gpm, movida por uma bomba de 12 hp, mantendo aeróbia a linha de recalque de 24 polegadas e 10.560 pés.

Números-chave

Perguntas

Qual era o problema na Parkway A?

Odor de esgoto ao longo da via, perto da Mark Twain Elementary School; os produtos químicos adicionados na Faraon Street Pump Station não bastavam, sobretudo em tempo seco. (PDF, página 1) (abre em nova aba)

Que sistema foi instalado?

Um Speece Cone de 4 pés de diâmetro na Faraon Street Pump Station, com uma bomba da corrente lateral de 12 hp e armazenamento de oxigênio líquido a granel, que fornece cerca de 1.600 libras de oxigênio dissolvido por dia. (PDF, página 2) (abre em nova aba)

O sistema adiciona ar ou bolhas à rede de esgoto?

Não. Apenas oxigênio dissolvido é misturado de volta à linha de recalque, na quantidade necessária para manter aeróbia toda a sua extensão. (PDF, página 2) (abre em nova aba)

Qual foi a consultoria?

A Burns & McDonnell, em seu terceiro projeto com a ECO₂, depois de Colorado Springs e Broomfield, Colorado. (PDF, página 2) (abre em nova aba)

O projeto

Parkway-A Force Main

Local
St. Joseph, Missouri
Aplicação
Controle de odor em esgoto
Capacidade
1.580 lb/dia
Veja o projeto

Na íntegra

Mais números-chave

Mais quatro, cada um com o que mede e sua página no PDF.

Do PDF

NúmeroO que mede
4 pés
Diâmetro do Speece Cone (Página 2 do PDF (abre em nova aba))
24 polegadas
Diâmetro da linha de recalque (Página 2 do PDF (abre em nova aba))
10.560 pés
Comprimento tratado da linha de recalque (Página 2 do PDF (abre em nova aba))
3 milhões de galões/dia
Vazão da linha de recalque (mais de) (Página 2 do PDF (abre em nova aba))

Texto completo como publicado (em inglês)

O texto como seus autores o escreveram.
As palavras do próprio estudo de caso, como publicadas. Os números são dos autores; o PDF (2 páginas) é o original, com as figuras, fotos e tabelas em forma de imagem.

City of St. Joseph, Missouri: Parkway A Odor Control Project

The City of St. Joseph, Missouri is the county seat of Buchanan County and the eighth largest city in Missouri with approximately 77,176 residents as of 2012. St. Joseph is the central service provider for a seven-county area of northwest Missouri and north east Kansas with a combined population of over 155,000.

Jesse James Home and Museum St. Joseph, MO

St. Joseph is located roughly 30-miles north of Kansas City, MO and approximately 125-miles south of Omaha, NE. The town has a rich history that includes Jesse James and the birthplace of the Pony Express.

The purpose of the Parkway A Odor Control Project was to address odors originating from the sewer system along the parkway in the vicinity of Mark Twain Elementary School. Chemicals to reduce odors were being added at the Faraon Street Pump Station. The chemical addition proved to not be sufficient to control the problem, especially during the periods of dry weather.

Mark Twain Elem. School

  • Technology: Pure Dissolved Oxygen for H₂S Prevention
  • Application: Sewer Force Main
  • Location: St. Joseph, Missouri
  • Consultant: Burns & McDonnell
  • Objectives: Prevent Odors; Protect Infrastructure

Force Main H₂S Prevention System

In the August 2, 2018 issue of the City Link (a publication of the City), the City stated the ECO₂ oxygenation system "is both more effective and economical than the current approach in controlling odors."

The consultant for the Parkway A Project was Burns & McDonnell; this is the third project in collaboration with this firm- Colorado Springs, CO and Broomfield, CO- being the first two.

The project details are as follows:

  • 24-inch force main diameter
  • 10,560-feet force main length
  • Over 3 million gallons per day

Results

The resulting ECO₂ system sized specifically for this project and installed at the Faraon Street Pump Station was a 4-ft diameter Speece Cone capable of delivering around 1,600 pounds of dissolved oxygen per day via a carrier stream of only 1,400 gallons per minute (gpm). The side stream pump, which brings raw wastewater from the force main pipe to the Speece Cone and right back into the force main pipe, was only a 12-horsepower pump. Ancillary components included a bulk liquid oxygen storage tank, vaporizer, and other associated oxygen storage equipment. The system dissolves just the precise amount of pure oxygen to maintain aerobic conditions in the entire length of the force main. Only dissolved oxygen is blended back into the force main, no air or bubbles are introduced into the sewer system. The system has been effectively preventing H₂S since 2018.

Como citar

Uma linha para colar em um relatório.

St. Joseph, MO Finds the Best Solution for Sewer Odors and Corrosion. ECO₂. Project engineer: Burns & McDonnell. Eco Oxygen Technologies Technical Library. https://eco2tech.com/technical-library/st-joseph-mo-finds-the-best-solution-for-sewer-odors-and-corrosion/

https://eco2tech.com/technical-library/st-joseph-mo-finds-the-best-solution-for-sewer-odors-and-corrosion/

O próximo passo

Pergunte a um engenheiro da ECO₂

Dúvidas sobre este estudo de caso ou sobre a sua água? Um engenheiro de aplicações responde, com os números.

Uma estação elevatória de esgoto reconstruída, com telhado verde, ao lado do Lake Sammamish